Sector/Station-wise Energy Plant Load Factor in West Bengal (November, 2018) | |||||
Sectors/Stations | Monitored Capacity (In MW) | Target (April 2018 to March 2019) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2017-2018) | |||
State Sector | |||||
DPL TPS | |||||
Durgapur Projects Limited (DPL) Coal | |||||
Bakreswar TPS | |||||
Bandel TPS | |||||
Kolaghat TPS | |||||
Sagardighi TPS | |||||
Santaldih TPS | |||||
WBPDC Coal | |||||
State Thermal | |||||
Haldia Gt (Liq.) | |||||
Kasba Gt (Liq.) | |||||
WBPDC Natural | |||||
State Natural | |||||
Jaldhaka HPS St-I | |||||
Purulia Pss HPS | |||||
Rammam HPS | |||||
WBSEDCL Hydro | |||||
State Hydro | |||||
Private Sector | |||||
Budge Budge TPS | |||||
Southern Repl. TPS | |||||
Titagarh TPS | |||||
CESC Coal | |||||
Haldia TPP | |||||
Haldia Energy Limited (HEL) Coal | |||||
Hiranmaya TPP | |||||
Hyel Coal | |||||
Private Thermal | |||||
Central Sector | |||||
Farakka STPS | |||||
NTPC Ltd. Coal | |||||
Central Thermal | |||||
Teesta Low Dam-III | |||||
Teesta Low Dam-IV | |||||
NHPC Hydro | |||||
Central Hydro | |||||
Total Thermal | |||||
Total Natural | |||||
Total Hydro | |||||
West Bengal | |||||
India |