Status of Ongoing Infrastructure Projects in Tripura (As on 01.05.2010) | |||||||
(Cost : Rs. in Crore) | |||||||
Project Name | DOA | DOC Original | DOC Anticipated | Cost Original | Cost Anticipated | Cost Overrun (%) | Time Overrun in Months |
Tirpura | |||||||
Agartala Sabroom | |||||||
Tripura Gas Based Power Project | |||||||
Up-Gradation of Konaban Ggs and Pipeline Grid Project, Tripura | |||||||
Total |