Progress of Installation of Telecom Equipment on Indian Railway (2001-2002 to 2014-2015) | ||||||||||||||
Installation | 2001-02 | 2002-03 | 2003-04 | 2004-05 | 2005-06 | 2006-07 | 2007-08 | 2008-09 | 2009-10 | 2010-11 | 2011-12 | 2012-13 | 2013-14 | 2014-15 |
Railways Telephone Subscribers Lines (Nos) | ||||||||||||||
No. of Control Sections Provided with Dual Tone Multiple Frequency (DTMF) Equipment | ||||||||||||||
Control Communication Through Wireless (18 GHz) (Route kms.) | ||||||||||||||
Mobile Train Radio Communication System (Route kms.) | ||||||||||||||
Optical Fibre Cable Communication (OFC) System for Control Communication (Route kms.) | ||||||||||||||
Quad Cable (Route Kilometers) | ||||||||||||||
Digital Microwave (7 GHz) (Route kms.) | ||||||||||||||
Public Address System (No. of Stations) | ||||||||||||||
Train Display Boards (No. of Stations) | ||||||||||||||
Interactive Voice Response System for Train Enquiry/Reservation Status (No. of Stations) | ||||||||||||||
Coach Guidance System (No. of Stations) | ||||||||||||||
RE Cable (Route Kilometers) | ||||||||||||||
BSNL OH (Route Kilometers) | ||||||||||||||
Railways OH (Route Kilometers) | ||||||||||||||
Very High Frequency Seats | ||||||||||||||
(a) 5 Watt Sets (Hand Held) (Nos.) | ||||||||||||||
(b) 25 Watt Sets (At Stations) (Nos.) | ||||||||||||||
Very Small Aperture Terminal (V SAT) (Nos.) | ||||||||||||||
Railnet Circuits (Nos.) | ||||||||||||||
Unreserved Ticket System Passenger Reservation System Circuit (No. of Stations) | ||||||||||||||
Freight Operation Information System Circuits (No. of Stations) | ||||||||||||||
Next Generation Networks and Exchange Circuits (No. of Stations) | ||||||||||||||
Railnet Connection |