Progress of Installation of Signal Equipment on Indian Railways (2011-2012 to 2018-2019) | ||||||||
Installations | 2011-2012 | 2012-2013 | 2013-2014 | 2014-2015 | 2015-2016 | 2016-2017 | 2017-2018 | 2018-2019 |
Panel Interlocking (No. of Stations) | ||||||||
Electronic Interlocking | ||||||||
Route Relay Interlocking (No. of Stations) | ||||||||
LED Lit Signals (No. of Stations) | ||||||||
Data Loggers (No. of Stations) | ||||||||
Color Light Signaling | ||||||||
PI/RRI/EI (Stations) | ||||||||
Last Vehicles Check by Axle Counters (No. of Stations) | ||||||||
Track Circuiting (No. of Locations) | ||||||||
Automatic Block Signaling (Track Kms.) | ||||||||
Intermediate Block Signaling (No. of Locations) | ||||||||
(A) Interlocking at Level Crossings | ||||||||
On Board Train Protection System (Route Kilometers) | ||||||||
Train Management System (No. of Stations) | ||||||||
Block Proving by Axle Counter (No. of Block Sections) |