Corridor-wise Status of Golden Quadrilateral Project in India (As on 30.06.2005 and 31.08.2007) | |||
Corridor (NH) | As on 30.06.2005 | Four-Laned Length (km) (As on 31.08.2007) | |
Total Length (Km) | Length where work Remains to be done Km (%) | ||
Delhi- Kolkata (NH-2) | |||
Kolkata-Chennai (NH-5, 6 & 60) | |||
Mumbai-Chennai (NH-4, 7 to 46) | |||
Delhi Mumbai (NH-8, 76 & 79) | |||
Total |