Station-wise Installed Capacity and Actual Generation of Hydro Electric Stations (Installed Capacity Above 25 MW) in Tamil Nadu (2016-2017 to 2019-2020-upto 30.05.2019) | |||||
Station/Utility | Installed Capacity (In Mega Watt) As on 30.05.2019 | Generation (In Million Unit) | |||
2016-2017 | 2017-2018 | 2018-2019 | 2019-2020 (upto 30.05.2019) | ||
Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) | |||||
Aliyar | |||||
Bhawani K Barrage-III | |||||
Bhawani K Barrage-II | |||||
Bhawani K Barrage-I | |||||
Kadamparai PSS | |||||
Kodayar I and II | |||||
Kundah I-V | |||||
Lower Mettur I-IV | |||||
Mettur Dam | |||||
Mettur Tunnel | |||||
Moyar | |||||
Papanasam | |||||
Parson`s Valley | |||||
Periyar | |||||
Pykara | |||||
Pykara Ultimate | |||||
Sarkarpathy | |||||
Sholayar I and II | |||||
Suruliyar | |||||
Total | |||||
Total Tamil Nadu | |||||
India |