Station-wise Energy Plant Load Factor in Sikkim | |||||
(2015-2016-upto May 2015) | |||||
Stations/Sectors | Monitored Capacity (MW) | Total (April 2015 to March 2016) | Plant Load Factor (%age) | ||
Program | Actual* | Actual Same Period (2014-15) | |||
Pvt Sector | |||||
Jorethang Loop | |||||
Depl Hydro | |||||
Chuzachen Hps | |||||
Gil Hydro | |||||
Teesta-Iii Hps | |||||
Tul Hydro | |||||
Pvt Hydro | |||||
Central Sector | |||||
Rangit Hps | |||||
Teesta V Hps | |||||
NHPC Hydro | |||||
Central Hydro | |||||
Total Hydro | |||||
Total Generation |