Length and Cost Sanctioned for National Highways Projects in Rajasthan (As on 24.12.2020 to June 2024) | |||||
Projects | Length (In KM) | Sanction Cost (Rs in Crore) | Date of Inauguration/ Foundation Stone Laying | Physical Progress | Target date of Completion |
Kota-Darah of NH-12 from 256/550 to 289/550 | |||||
Balotra-Sanderao NH- 325 (Package-I) from km 16/200 to KM 58/00. | |||||
Balotra-Sanderao NH-325 (Package-II) from 58/0 to 91/600 | |||||
Balotra-Sanderao NH- 325 (Package-III) from 118/900 to 156/955 | |||||
Rajgarh-Haryana Border NH-709 Extn. | |||||
Wajwana–Banswara) from km 251+120 to 275+000 Section of NH-927A. | |||||
Nagaur Bypass from Existing Km 166/260 to Km 180/500 of NH-65. | |||||
Dausa-Lalsot-Kothun Section of NH-148 & NH-23 | |||||
Construction of Balance Work of Six Laning of Jaipur Ring Road (Southern Corridor) (Km. 0+300 to Km. 46+700) from Agra Road to Ajmer Road of NH-148C. | |||||
Munabao-Sundra-Myajlar-Tanot Section of NH-70 | |||||
Gagaria-Baori-Kalan- Serwa-Sata Gandav Section of NH- 925 & NH-925A | |||||
Widening and Strengthening of Sanchore-Nenava Section from km 0.00 to km 11.800 of NH 168A. | |||||
Up-gradation to 2LPS of Nagaur-Bikaner Section by Executing Balance Work from km 177.00 to km 267.325 on NH-89 (New NH-62) on EPC mode. | |||||
Up-gradation to 2LPS of Ajmer-Nagaur Section by Executing Balance Work from Km. 0.000 to Km. 148.25 on NH-89 (New NH-58) on EPC. | |||||
Rehabilitation and up Gradation to 2L+PS of Beawar-Asind Section (km 30.00 to Km 74.00) of NH 158 (GNHCP) with the Loan Assistance of World Bank on EPC mode. | |||||
Rehabilitation and up Gradation to 2L+PS of Asind-Mandal Section (km 74.00 to Km 116.750 of NH 158 (GNHCP) with the Loan Assistance of World Bank on EPC mode. | |||||
Up-gradation to 4 Lane with Paved shoulder from Existing km 58/245 (Beawar) to Existing km 108/600 (Bhim) of NH-58 (Beawar-Gomti Section on EPC mode in the State of Rajasthan (Pkg-I.) | |||||
Up-gradation to 4 Lane with Paved Shoulder from Existing Km 108.600 (Bhim) to 144.00 (Baghana) & Km 158.419 (Mada ki Bassi) to Km. 173.300 (Gomti) (Total Length 50.281 Km.) of NH-58 (Beawar-Gomti section) on EPC mode in the State of Rajasthan (Pkg-II). | |||||
Construction of Balance Works as Part 2 (Two Number of Interchanges) (Cloverleaf) of Jaipur Ring Road (NH–148C) from Tonk Road (NH–52) to Ajmer Road Section (NH-48). | |||||
Additional Structures on Gurgaon-Kotputli- Jaipur section of NH- 8. | |||||
Construction of 4 Lane Flyover at Indira Circle in Suratgarh Town at Km 171.100 on Bikaner–Suratgarh Section of NH -62. | |||||
Strengthening for Suratgarh-Sriganganagar Section of NH- 62 from km 173.00 to 250.900. | |||||
Construction of 4 Lane ROB at Km 102/00 of NH- 325 (at LC no. C-48) at Jalore. | |||||
06 nos. of Flyovers on Jaipur-Kishangarh Section of NH-8 | |||||
Six Flyovers and Two VUPs on Six Lane Jaipur-Kishangarh-Ajmer- Beawar Section of NH-48, NH-448 and NH-58 (Old NH-8) in the States of Rajasthan on EPC Mode | |||||
Pindwara-Udaipur Section NH-76 | |||||
Up-gradation to 2 Lane with Paved shoulder of Sriganganagar- Raisinghnagar Section NH-911 | |||||
Gandhav-Sanchore-Gujrat Border NH-68 | |||||
Total | |||||
India |