Station-wise/State-wise Allocation of Power from Central Generating Stations (CGSs) in Western Region of India - Part I (As on 31.03.2016) | ||||||||||||
Stations | Installed Capacity (In MW) | Allocated Capacity# (In MW) | Chhattisgarh | Gujarat | Madhya Pradesh | Maharashtra | Daman and Diu | |||||
(In %age) | (In MW) | (In %age) | (In MW) | (In %age) | (In MW) | (In %age) | (In MW) | (In %age) | (In MW) | |||
A. Firm Share | ||||||||||||
Korba STPS | ||||||||||||
Korba STPS U# 7 | ||||||||||||
Vindhyachal STPS - I | ||||||||||||
Vindhyachal STPS - II | ||||||||||||
Vindhyachal STPS - III | ||||||||||||
Vindhyachal STPS - IV | ||||||||||||
Vindhyachal STPS - V | ||||||||||||
Sipat STPS Stage - I (3 Units) | ||||||||||||
Sipat STPS Stage - II | ||||||||||||
Kawas GBS | ||||||||||||
Bhilai TPS $ | ||||||||||||
Ratnagiri GPS | ||||||||||||
Kakrapar APS | ||||||||||||
Tarapur APS | ||||||||||||
Tarapur APS U# 3 and 4 | ||||||||||||
Gandhar GBS | ||||||||||||
Mouda STPS-I | ||||||||||||
Sub-Total (A) | ||||||||||||
B. Dedicated Stations | ||||||||||||
Omkareshwar HEP | ||||||||||||
Indira Sagar HEP | ||||||||||||
Sub-Total (B) | ||||||||||||
C. Firm Share from/to other Regions | ||||||||||||
From ER-Kahalgaon STPS-II | ||||||||||||
From SR-Ramagundam STPS | ||||||||||||
Merchant Power of Korba STPS U# 7$$ | ||||||||||||
Sub-Total (C) | ||||||||||||
D. Total Firm Share [=A+B+C] | ||||||||||||
E. Unallocated Power of WR CGSs | ||||||||||||
E1. Unallocated Power to Jammu and Kashmir | ||||||||||||
E2. Bangladesh (NVVN A/c BPDB) | ||||||||||||
E3. Unallocated Power in WR Pool [=E-E1-E2] | ||||||||||||
E3.1. Specific Allocation from E3 above | ||||||||||||
(i) For Bundling with Solar Power (under JNNSM) | ||||||||||||
(ii) DD, DNH and Goa | ||||||||||||
(iii) HVDC-BHD Station | ||||||||||||
(iv) HVDC-VIN Station | ||||||||||||
(v) BARC facilities from TAPS (3 and 4) | ||||||||||||
(vi) MP(Bundelkhand) | ||||||||||||
(vii) HWP of DAE | ||||||||||||
E3.2. Balance Unallocated Power in WR Pool [=E3-E3.1] | ||||||||||||
Sub-Total (E)* | ||||||||||||
F. Total Power to Wr Beneficiaries [=D+E] | ||||||||||||
G. Commissioned But Non-CoD Units | ||||||||||||
H. Total Power [=F+G] |