Station/State-wise Allocation of Power from Central Generating Stations (CGSs) in Eastern Region of India - Part II (As on 31.03.2018) | |||||||||||||||||
Stations | Installed Capacity (In MW) | Other Region/ Country | |||||||||||||||
Allocated Capacity (In MW) | Assam | Tamil Nadu | North Eastern | Nortern Region | Western Region | Southern | Power Exchange | Bangladesh | |||||||||
%age | (In MW) | %age | (In MW) | %age | (In MW) | %age | (In MW) | %age | (In MW) | (In MW) | %age | (In MW) | %age | (In MW) | |||
(A) Firm Share | |||||||||||||||||
NTPC Stations | |||||||||||||||||
Barh STPS Stage-II (U# 4 & 5) | |||||||||||||||||
Farakka (U# 1 to 5) | |||||||||||||||||
Farakka (U# 6) | |||||||||||||||||
Kahalgaon | |||||||||||||||||
Kahalgaon-II (3 units) | |||||||||||||||||
Nabinagar TPS -JV (Unit #1 & 2) ## | |||||||||||||||||
Talcher | |||||||||||||||||
Talcher Stage-II | |||||||||||||||||
Muzaffpur TPS U#3 & 4 | |||||||||||||||||
NHPC Stations | |||||||||||||||||
Rangit HPS | |||||||||||||||||
Teesta-V HPS (3units) | |||||||||||||||||
Bhutan Stations Tala HPS (Bhutan) * | |||||||||||||||||
Chukha HPS (270(In MW) Out of 336 (In MW) Allocated to India) | |||||||||||||||||
Kurichu HPS | |||||||||||||||||
Sub-Total (A) | |||||||||||||||||
(B) Dedicated Stations | |||||||||||||||||
Muzaffurpur TPS U# 1 & 2 | |||||||||||||||||
Talcher TPS | |||||||||||||||||
DVC** | |||||||||||||||||
Teesta Low Dam | |||||||||||||||||
Sub-Total (B) | |||||||||||||||||
(C) Firm Power From to Other Region | |||||||||||||||||
(C1) DVC`s Surrendered Share## | |||||||||||||||||
(C2) -6 / Merchant Power of Farakka U# 6 | |||||||||||||||||
(C3) Merchant Power of Korba U# 7 (WR) | |||||||||||||||||
(C4) Allocation to NR in Lieu of Tala Power | |||||||||||||||||
(I) Farakka (Unit 1 to 5) | |||||||||||||||||
(ii) Kahalgaon | |||||||||||||||||
(iii) Kahalgaon-II (3 units) | |||||||||||||||||
(iv) DVC`s Mejia U#6 (150 (In MW)) | |||||||||||||||||
(v) Unallocated Power of Tala (15% of 1020 (In MW))* | |||||||||||||||||
Sub-Total (C) | |||||||||||||||||
D. Total Firm Power [=A+B+C] | |||||||||||||||||
(E) Unallocated Power of ER CGSs | |||||||||||||||||
(E1) Unallocated Power of NHPC Stations^ | |||||||||||||||||
E2. Unallocated Power of Bhutan HPSs^ | |||||||||||||||||
E3. Unallocated Power of NTPC stations | |||||||||||||||||
E3.1.Specific Allocation from E3 above | |||||||||||||||||
(i) Bundling with Dadri Solar Power | |||||||||||||||||
(ii) Bundling with JNNSM Solar power | |||||||||||||||||
(iii)Nabinagar TPS -JV(Unit #1 & 2 500(In MW)) | |||||||||||||||||
(iv)Muzaffpur TPS U#3 & 4 | |||||||||||||||||
(E3.2) Balance Unallocated Share of NTPC Stations [=E3-E3.1] | |||||||||||||||||
(i) Barh STPS | |||||||||||||||||
(ii) Farakka (U# 1 to 5) | |||||||||||||||||
(iii) Farakka (U# 6) | |||||||||||||||||
(iv) Kahalgaon | |||||||||||||||||
(v) Kahalgaon-II (3 units) | |||||||||||||||||
(vi) Talcher | |||||||||||||||||
Sub-Total (E3) [=E3.1+E3.2] | |||||||||||||||||
Sub-Total (E) [=E1+E2+E3] | |||||||||||||||||
(F) Total Allocation to ER Beneficiaries [=D+E] | |||||||||||||||||
(G) Commissioned But Non-CoD Units | |||||||||||||||||
(i) Raghunathpur, Ph-I, U# | |||||||||||||||||
(ii) Teesta Low Dam U#2, Stg. IV(40 (In MW)) | |||||||||||||||||
(iii) Bokaro-A (DVC Project) 1x500 (In MW) | |||||||||||||||||
(iv) Total Power [=F+G] |