Station/State-wise Allocation of Power from Central Generating Stations (CGSs) in Eastern Region of India - Part II (As on 31.03.2016) | ||||||||||||
Stations | West Bengal | Sikkim | PGCIL (In MW) | Assam (In MW) | Tamil Nadu (In MW) | North Eastern Region (In MW) | Northern Region (In MW) | Western Region (In MW) | Southern Region (In MW) | Bang- ladesh (In MW) | ||
(In %age) | (In MW) | (In %age) | (In MW) | |||||||||
A. Firm Share | ||||||||||||
NTPC Stations | ||||||||||||
Barh STPS Stage-II (U# 4) | ||||||||||||
Farakka (U# 1 to 5) | ||||||||||||
Farakka (U# 6) | ||||||||||||
Kahalgaon | ||||||||||||
Kahalgaon-II (3 units) | ||||||||||||
Talcher | ||||||||||||
Talcher Stage-II | ||||||||||||
NHPC Stations | ||||||||||||
Rangit HPS | ||||||||||||
Teesta-V HPS (3 units) | ||||||||||||
Bhutan Stations | ||||||||||||
Tala HPS (Bhutan) * | ||||||||||||
Chukha HPS (270MW out of 336 MW Allocated to India) | ||||||||||||
Kurichu HPS | ||||||||||||
Sub-Total (A) | ||||||||||||
B. Dedicated Stations | ||||||||||||
Muzaffurpur TPS U# 1 & 2 | ||||||||||||
Talcher TPS | ||||||||||||
DVC** | ||||||||||||
Teesta Low Dam | ||||||||||||
Sub-Total (B) | ||||||||||||
C. Firm Power from/to Other Regions | ||||||||||||
C1. DVC`s Surrendered Share## | ||||||||||||
C2. Merchant Power of Korba U# 7 | ||||||||||||
C3. Merchant Power of Farakka U# 6 | ||||||||||||
C4. Allocation to NR in Lieu of Tala power | ||||||||||||
(i) Farakka (Unit 1 to 5) | ||||||||||||
(ii) Kahalgaon | ||||||||||||
(iii) Kahalgaon-II (3 units) | ||||||||||||
(iv) DVC Mejia U#6 (150 MW) | ||||||||||||
(v) Unallocated Power of Tala (15% of 1020 MW)* | ||||||||||||
Sub-Total (C) | ||||||||||||
D. Total Firm Power [=A+B+C] | ||||||||||||
E. Unallocated Power of ER CGSs | ||||||||||||
E1. Unallocated Power of NHPC Stations+ | ||||||||||||
E2. Unallocated Power of Bhutan HPSs+ | ||||||||||||
E3. Unallocated Power of NTPC Stations | ||||||||||||
E3.1. Specific Allocation from E3 above | ||||||||||||
(i) Bundling with Dadri Solar Power | ||||||||||||
(ii) Bundling with JNNSM Solar Power | ||||||||||||
E3.2. Balance Unallocated Share of NTPC Stations [=E3-E3.1] | ||||||||||||
(i) Barh STPS Stage-II (U# 4) | ||||||||||||
(ii) Farakka (U# 1 to 5) | ||||||||||||
(iii) Farakka (U# 6) | ||||||||||||
(iv) Kahalgaon | ||||||||||||
(v) Kahalgaon-II (3 units) | ||||||||||||
(vi) Talcher | ||||||||||||
Sub-Total (E3) [=E3.1+E3.2] | ||||||||||||
Sub-Total (E) [=E1+E2+E3] | ||||||||||||
F. Total Allocation to ER Beneficiaries [=D+E] | ||||||||||||
G. Commissioned but Non-CoD units | ||||||||||||
1. Muzaffpur TPS U# 3 | ||||||||||||
2. Barh-II U# 5 | ||||||||||||
3. Raghunathpur, Ph-I, U# 1 | ||||||||||||
4. Teesta Low Dam U#2, Stg. IV (40 MW) | ||||||||||||
5. Bokaro-A (DVC Project) 1x500 MW | ||||||||||||
6. Nabinagar TPP, Unit#1, 250MW | ||||||||||||
H. Total Power [=F+G] |