Sample Data Format
 Station/State-wise Allocation of Power from Central Generating Stations (CGSs) in Eastern Region of India - Part I
(As on 31.03.2016) 
 Stations  Installed
Capacity
(In MW) 
 Allocated
Capacity#
(In MW) 
 Bihar   Jharkhand   D.V.C.   Odisha 
 (In %age)  (In MW)  (In %age)  (In MW)  (In %age)  (In MW)  (In %age)  (In MW) 
 A. Firm Share                     
 NTPC Stations                     
 Barh STPS Stage-II (U# 4)                     
 Farakka (U# 1 to 5)                     
 Farakka (U# 6)                     
 Kahalgaon                     
 Kahalgaon-II (3 units)                     
 Talcher                     
 Talcher Stage-II                     
 NHPC Stations                     
 Rangit HPS                     
 Teesta-V HPS (3 units)                     
 Bhutan Stations                     
 Tala HPS (Bhutan) *                     
 Chukha HPS (270MW out of
336 MW Allocated to India) 
                    
 Kurichu HPS                     
 Sub-Total (A)                     
 B. Dedicated Stations                     
 Muzaffurpur TPS U# 1 & 2                     
 Talcher TPS                     
 DVC**                     
 Teesta Low Dam                     
 Sub-Total (B)                     
 C. Firm Power from/to Other Regions                     
 C1. DVC`s Surrendered Share##                     
 C2. Merchant Power of Korba U# 7                     
 C3. Merchant Power of Farakka U# 6                     
 C4. Allocation to NR in Lieu of Tala power                     
 (i) Farakka (Unit 1 to 5)                     
 (ii) Kahalgaon                     
 (iii) Kahalgaon-II (3 units)                     
 (iv) DVC Mejia U#6 (150 MW)                     
 (v) Unallocated Power of Tala (15% of 1020 MW)*                     
 Sub-Total (C)                     
 D. Total Firm Power [=A+B+C]                     
 E. Unallocated Power of ER CGSs                     
 E1. Unallocated Power of NHPC Stations+                     
 E2. Unallocated Power of Bhutan HPSs+                     
 E3. Unallocated Power of NTPC Stations                     
 E3.1. Specific Allocation from E3 above                     
 (i) Bundling with Dadri Solar Power                     
 (ii) Bundling with JNNSM Solar Power                     
 E3.2. Balance Unallocated Share
of NTPC Stations [=E3-E3.1] 
                    
 (i) Barh STPS Stage-II (U# 4)                     
 (ii) Farakka (U# 1 to 5)                     
 (iii) Farakka (U# 6)                     
 (iv) Kahalgaon                     
 (v) Kahalgaon-II (3 units)                     
 (vi) Talcher                     
 Sub-Total (E3) [=E3.1+E3.2]                     
 Sub-Total (E) [=E1+E2+E3]                     
 F. Total Allocation to ER Beneficiaries [=D+E]                     
 G. Commissioned but Non-CoD units                     
 1. Muzaffpur TPS U# 3                     
 2. Barh-II U# 5                     
 3. Raghunathpur, Ph-I, U# 1                     
 4. Teesta Low Dam U#2, Stg. IV (40 MW)                     
 5. Bokaro-A (DVC Project) 1x500 MW                     
 6. Nabinagar TPP, Unit#1, 250MW                     
 H. Total Power [=F+G]                     
 
 
A storehouse of socio-economic statistical of 620 districts. A cluster of 11 associate websites
Provides election data for all 543 parliamentary and 4120 state assembly constituencies
A collection of over 4000 data-oriented publication in print, eBook, eFlipbook & web-based access formats
A comprehensive collection of Infographics, videos, maps and charts on various socio-economic and electoral Insights
An e-resource providing socio-economic statistical information about India, its states, sectors, regions, and districts.
A one-stop-app for all who are craving for the latest economic facts and figures of India.
One-of-a-kind online learning platform offering specialised courses and also providing interactive learning.
Twenty Four years of serving socio-economic and electoral research fraternity in india and abroad.
© Datanet India Pvt. Ltd.