Station/State-wise Allocation of Power from Central Generating Stations (CGSs) in Southern Region of India - Part I (As on 31.03.2016) | ||||||||||
Stations | Installed Capacity (In MW) | Allocated Capacity# (In MW) | Andhra Pradesh | Karnataka | Kerala | Tamil Nadu | ||||
(In %age) | (In MW) | (In %age) | (In MW) | (In %age) | (In MW) | (In %age) | (In MW) | |||
A) Firm Share | ||||||||||
Ramagundam## St. I and II | ||||||||||
Ramagundam St. III | ||||||||||
Talcher$ St. II | ||||||||||
Simhadri STPS St. II U# 1,2 | ||||||||||
NLC TPS-II St. I | ||||||||||
NLC TPS-II St. II | ||||||||||
NLC TPS-I Exp. | ||||||||||
NLC TPS-II Exp. U# 1,2 | ||||||||||
Vallur STPS U# 1, 2 and 3 | ||||||||||
NTPL Tuticorin U# 1,2 | ||||||||||
Madras APS | ||||||||||
Kaiga APS U# 1 and 2 | ||||||||||
Kaiga APS U# 3 and 4 | ||||||||||
Kudankulam NPP U# 1 | ||||||||||
Sub-Total (A) | ||||||||||
(B) Dedicated Stations | ||||||||||
Simhadri | ||||||||||
Kayamkulam CCGT | ||||||||||
NLC TPS-I | ||||||||||
Sub-Total (B) | ||||||||||
(C) Unallocated Quota | ||||||||||
(i) Unallocated Power of SR CGSs | ||||||||||
ii) NVVN Coal Power for Bundling with Solar Power (under JNNSM) | ||||||||||
(iii) Balance Unallocated Power (Incl. Specific Allocation=(i)-(ii) | ||||||||||
Sub-Total (C) =(ii)+(iii) | ||||||||||
D) Total Allocation from CGSs of ={A+B+C} | ||||||||||
(E) Allocation from Other Regions | ||||||||||
(i) Power from DVC`s Share of ER | ||||||||||
(ii) Diversion of firm Share (374 MW) Surrendered by Delhi in IGSTPS, Jhajjar | ||||||||||
Sub-Total (E)=(i)+(ii) | ||||||||||
(F) Total Allocation Including from Other Regions =D+E | ||||||||||
(G) Commissioned But Non-CoD Units | ||||||||||
(H) Total Power Allocation =F+G |