Station/State-wise Allocation of Power from Central Generating Stations (CGSs) in Northern Region of India - Part II (As on 31.03.2016) | ||||||||||||
Stations | Within the Region | Other Region/Country | ||||||||||
Jammu and Kashmir | Punjab | Rajasthan | Uttar Pradesh | Uttarakhand | ||||||||
(In %age) | (In MW) | (In %age) | (In MW) | (In %age) | (In MW) | (In %age) | (In MW) | (In %age) | (In MW) | (In %age) | (In MW) | |
A. Firm Share | ||||||||||||
A1. NR CGSs | ||||||||||||
Singrauli STPS | ||||||||||||
Rihand STPS | ||||||||||||
Rihand STPS Stg. - II | ||||||||||||
Rihand STPS Stg. - III (Unit 5 and 6) | ||||||||||||
Unchahar - I TPS | ||||||||||||
Unchahar - II TPS | ||||||||||||
Unchahar - III TPS (Unit 5) | ||||||||||||
Dadri NCTPS | ||||||||||||
Dadri NCTPS Stage-II | ||||||||||||
Dadri NCGPS | ||||||||||||
Anta GPS | ||||||||||||
Auraiya GPS | ||||||||||||
Indira Gandhi STPS (Jhajjar) (Unit 1,2 and 3)## | ||||||||||||
Narora Atomic Power Station | ||||||||||||
Rajasthan Atomic Power Plant (U-5 & 6) | ||||||||||||
Salal HPS | ||||||||||||
Chamera HPS-I | ||||||||||||
Chamera HPS-II | ||||||||||||
Chamera HPS-III | ||||||||||||
Tanakpur HPS | ||||||||||||
Bairasiul HPS | ||||||||||||
Uri-I HPS | ||||||||||||
Uri-II HPS (unit 1,2,3 and 4) | ||||||||||||
Dhauliganga HEP | ||||||||||||
Nathpa Jhakri HPS $ | ||||||||||||
Dulhasti HEP | ||||||||||||
Tehri Stage - I (4 Units)## | ||||||||||||
Sewa - II HEP (3 units) | ||||||||||||
Koteshwar HEPS (Unit 1,2,3 and 4) | ||||||||||||
Parbati-III HEP (Unit-1,2,3,4) | ||||||||||||
Rampur HEP (Unit#1,2,3,4,5,6) | ||||||||||||
Koldam HEP (800 MW) | ||||||||||||
Sub-Total A1 (NR CGSs) | ||||||||||||
A2. CGSs of other Regions | ||||||||||||
Farakka STPS (1600 MW) | ||||||||||||
Kahalgaon - I (840 MW) | ||||||||||||
Mezia unit 6 (250 MW) | ||||||||||||
Kahalgaon - II (1500 MW) [498 MW firm+ 343 MW in Lieu of Tala] | ||||||||||||
Sub-Total A2 (CGSs other Regions) | ||||||||||||
Sub-Total (A) | ||||||||||||
B. Non-Firm Allocation | ||||||||||||
Rajasthan Atomic Power Station U-3 and 4 | ||||||||||||
C. Dedicated Stations | ||||||||||||
Badarpur TPS | ||||||||||||
Tanda TPS | ||||||||||||
Faridabad CCGT | ||||||||||||
Rajasthan Atomic Power Station U-1 and 2 | ||||||||||||
Chutak (H) 4*11 | ||||||||||||
Barsingsar Lignite (T) 2*125 | ||||||||||||
Sub-Total (C) | ||||||||||||
D. Total Allocation [=A+B+C] | ||||||||||||
E. Total Unallocated Power of NR CGSS Excluding RAPS 3 and 4 | ||||||||||||
E1. Specific Allocation to other Regions/Countries from E above | ||||||||||||
E2. Balance Unallocated Power of NR CGSs Excluding RAPs 3 and 4 [=E-E1] | ||||||||||||
E2.1. Specific Allocations from E2 above | ||||||||||||
To Power Grid (HVDC) $ | ||||||||||||
To Railways $$ | ||||||||||||
To Jammu and Kashmir | ||||||||||||
For Bundling with Solar Power (under JNNSM) | ||||||||||||
To uP (Due to Drought) | ||||||||||||
Sub-Total (E2.1) | ||||||||||||
E2.2. Balance Unallocated Power of NR CGSs in the Pool Excluding RAPS 3 and 4 [=E2-E2.1] | ||||||||||||
F. Unallocated Power RAPS 3 and 4 (440-374) | ||||||||||||
G. Unallocated Power of Tala HEP (Bhutan) | ||||||||||||
H. Unallocated Power from WR | ||||||||||||
I. Total Unallocated in NR [= E2.1+E2.2+F+G+H] | ||||||||||||
J. Net Power of NR Excluding Bangladesh BPDB Power [=D+I] | ||||||||||||
K. Commissioned But Non-CoD Units | ||||||||||||
Nimmo Bazgo unit 2 | ||||||||||||
Nimmo Bazgo unit 3 | ||||||||||||
Nimmo Bazgo unit 1 | ||||||||||||
L. Total Power [=Jammu+Kashmir] |