State/Station-wise Energy Plant Load Factor in Eastern Region of India (2016-2017) | |||||
States/Stations/Sectors | Monitored Capacity (MW) | Total (April 2016 to March 2017) | Plant Load Factor (%age) | ||
Program | Actual | Actual Same Period (2015-16) | |||
Andaman Nicobar | |||||
State Sector | |||||
And. Nicobar Dg | |||||
A&N Adm D.G | |||||
State Thermal | |||||
Total Thermal | |||||
Total Andaman Nicobar | |||||
Bihar | |||||
State Sector | |||||
Barauni TPS | |||||
Bseb Coal | |||||
State Thermal | |||||
Central Sector | |||||
Nabi Nagar Tpp | |||||
Brbcl Coal | |||||
Muzaffarpur TPS | |||||
K.B.U.N.L Coal | |||||
New Nabi Nagar Tpp | |||||
Npgcpl Coal | |||||
Barh I | |||||
Barh II | |||||
Kahalgaon TPS | |||||
Ntpc Ltd. Coal | |||||
Central Thermal | |||||
Total Thermal | |||||
Total Bihar | |||||
DVC | |||||
Central Sector | |||||
Bokaro TPS `A` Exp | |||||
Bokaro `B` TPS | |||||
Chandrapura(Dvc) | |||||
Durgapur Steel TPS | |||||
Durgapur TPS | |||||
Kodarma Tpp | |||||
Mejia TPS | |||||
Raghunathpur Tpp | |||||
Dvc Coal | |||||
Central Thermal | |||||
Maithon HPS. | |||||
Panchet HPS. | |||||
Dvc Hydro | |||||
Central Hydro | |||||
Total Thermal | |||||
Total Hydro | |||||
Total Dvc | |||||
Jharkhand | |||||
State Sector | |||||
Tenughat TPS | |||||
Tvnl Coal | |||||
State Thermal | |||||
Subernrekha HPS. | |||||
Jseb Hydro | |||||
State Hydro | |||||
Pvt Sector | |||||
Mahadev Prasad Stpp | |||||
Adhunik Coal | |||||
Maitrishi Usha TPS | |||||
Cpl Coal | |||||
Maithon Rb Tpp | |||||
Mpl Coal | |||||
Jojobera TPS | |||||
Tata Pcl Coal | |||||
Pvt Thermal | |||||
Central Sector | |||||
Patratu TPS | |||||
Pvunl Coal | |||||
Central Thermal | |||||
Total Thermal | |||||
Total Hydro | |||||
Total Jharkhand | |||||
Odisha | |||||
State Sector | |||||
Ib Valley TPS | |||||
Opgc Coal | |||||
State Thermal | |||||
Balimela HPS. | |||||
Hirakud HPS | |||||
Machkund HPS | |||||
Rengali HPS. | |||||
Upper Indravati HPS. | |||||
Upper Kolab HPS. | |||||
Ohpc Hydro | |||||
State Hydro | |||||
Pvt Sector | |||||
Kamalanga TPS | |||||
Gmr Energ Coal | |||||
Utkal Tpp (Ind Barath) | |||||
Ibpil Coal | |||||
Iccl (Imfa) Imp | |||||
Iccl Coal | |||||
Derang Tpp | |||||
Jitpl Coal | |||||
Lanco Babandh Tpp | |||||
Lbpl Coal | |||||
Nalco Imp | |||||
Nalco Coal | |||||
Sterlite Tpp | |||||
Sel Coal | |||||
Pvt Thermal | |||||
Central Sector | |||||
Talcher (Old) TPS | |||||
Talcher STPS | |||||
Ntpc Ltd. Coal | |||||
Central Thermal | |||||
Total Thermal | |||||
Total Hydro | |||||
Total Orissa | |||||
Sikkim | |||||
State Sector | |||||
Teesta-Iii HPS | |||||
Tul Hydro | |||||
State Hydro | |||||
Pvt Sector | |||||
Jorethang Loop | |||||
Tashiding HPS | |||||
Depl Hydro | |||||
Chuzachen HPS | |||||
Gisl Hydro | |||||
Dikchu HPS | |||||
Skpppl Hydro | |||||
Pvt Hydro | |||||
Central Sector | |||||
Rangit HPS | |||||
Teesta V HPS | |||||
Nhpc Hydro | |||||
Central Hydro | |||||
Total Hydro | |||||
Total Sikkim | |||||
West Bengal | |||||
State Sector | |||||
D.P.L. TPS | |||||
Dpl Coal | |||||
Bakreswar TPS | |||||
Bandel TPS | |||||
Kolaghat TPS | |||||
Sagardighi TPS | |||||
Santaldih TPS | |||||
Wbpdc Coal | |||||
State Thermal | |||||
Haldia Gt (Liq.) | |||||
Kasba Gt (Liq.) | |||||
Wbpdc Natural | |||||
State Natural | |||||
Jaldhaka HPS St-I | |||||
Purulia Pss HPS. | |||||
Rammam HPS. | |||||
Wbsedcl Hydro | |||||
State Hydro | |||||
Pvt Sector | |||||
Budge Budge TPS | |||||
Southern Repl. TPS | |||||
Titagarh TPS | |||||
Cesc Coal | |||||
Chinakuri TPS | |||||
Dpscltd Coal | |||||
Haldia Tpp | |||||
Hel Coal | |||||
India Power Tpp (Haldia) | |||||
Iel Coal | |||||
Pvt Thermal | |||||
Central Sector | |||||
Farakka STPS | |||||
Ntpc Ltd. Coal | |||||
Central Thermal | |||||
Teesta Low Dam-Iii | |||||
Teesta Low Dam-Iv | |||||
Nhpc Hydro | |||||
Central Hydro | |||||
Total Thermal | |||||
Total Natural | |||||
Total Hydro | |||||
Total West Bengal |