Selected State/Sector/Scheme-wise Annual Generation Loss of Delayed Under Construction Hydro Electric Projects (above 25 MW) in India (As on 30.06.2019 and 31.12.2019) | |||||
30.06.2019 | 31.12.2019 | ||||
States | Scheme/Executing Agencies | Sector | Cap. Under Execution (In MW) | Loss of Energy (In MU/Year) | Installed Capacity (in MW) |
Andhra Pradesh | |||||
Arunachal Pradesh | |||||
Himachal Pradesh | |||||
Jammu and Kashmir | |||||
Kerala | |||||
Madhya Pradesh | |||||
Maharashtra | |||||
Punjab | |||||
Sikkim | |||||
Tamil Nadu | |||||
Uttarakhand | |||||
West Bengal | |||||
India |