Scheme-wise Generation (Reservoir Based and the Rest) by Hydro Electric Stations in India (2012-2013) | ||||
Type of Scheme | Installed Capacity (As on 31.03.2013) (MW) | Generation (2012-13) | ||
Target (MU) | Actual (MU) | Shortfall (-) / Surplus (+) Over Target (%) | ||
Reservoir Based Schemes (31 Nos.) | ||||
Other Schemes | ||||
Total |