Region/Station-wise Status of Reservoir Based Hydro Electricity Stations in India (1995-1996) | |||||||||||
Hydro Electricity Station | Installed Capacity As on 31.03.1996 (MW) | Annual Design Potential (MU) | Full Reservoir Level (FT) | Minimum Draw Down Level (FT) | Reservoir Cap. At FRL | Energy Content at FRL (MU) | Levels Attained during 1995-96 | ||||
Gross (MCM) | Live MCM) | Minimum (FT) | Date | Maximum | Date | ||||||
Northern Region | |||||||||||
Bhakra Nangal | |||||||||||
Bhakra Left | |||||||||||
Bhakra Right | |||||||||||
Gangowal | |||||||||||
Kotla | |||||||||||
Pong | |||||||||||
R P.Sagar & | |||||||||||
Jawahar Sagar | |||||||||||
Rihand & Obra | |||||||||||
Rihand | |||||||||||
Obra | |||||||||||
Western Region | |||||||||||
Ukai | |||||||||||
Gandhi Saqar | |||||||||||
Koyna | |||||||||||
Koyna- I & II | |||||||||||
Koyna- III | |||||||||||
Koyna D.P.H. | |||||||||||
Southern Region | |||||||||||
Machkund | |||||||||||
Srisailam | |||||||||||
Nagarjunasagar | |||||||||||
Sharavathy & Jog | |||||||||||
Sharavathy | |||||||||||
Jog | |||||||||||
Kalinadi & Supa | |||||||||||
Kalinadi | |||||||||||
Supa DPH | |||||||||||
Idukki | |||||||||||
Sabarigiri | |||||||||||
Eastern Region | |||||||||||
Hirakud | |||||||||||
Burla P.H. | |||||||||||
Chiplima P.H. | |||||||||||
Balimela |