Installed Capacity, Generation, Planned Maintenance, Forced Outage and Operating Availability of Hydro Electric Stations in India (2007-2008 to 2018-2019) | |||||||||
Year | Installed Capacity (In MW) | Generation | Unit Analysed | Planned Maintenance (PM) (%age) | Forced Outage (FO) (%age) | Operating Availability (OP.AV.) (%age) | |||
Target (IN MU) | Actual (In MU) | Varition (%age) | Nos. | Capacity (IN MW) | |||||
2007-2008* | |||||||||
2008-2009 | |||||||||
2009-2010 | |||||||||
2010-2011 | |||||||||
2011-2012 | |||||||||
2012-2013 | |||||||||
2013-2014 | |||||||||
2014-2015 | |||||||||
2015-2016 | |||||||||
2016-2017 | |||||||||
2017-2018 | |||||||||
2018-2019 |