Forced Outages and Energy Losses Due to Failure of Equipment and Auxiliaries in Thermal Power Stations (Capacity 195-200 MW) in India (2012-2013 to 2014-2015) | |||||||||
Area/Causes of Outage (195-200 MW Cap. Group) | No. of Outage | MU Loss | %age of Group F.O Loss | ||||||
2012-2013 | 2013-2014 | 2014-2015 | 2012-2013 | 2013-2014 | 2014-2015 | 2012-2013 | 2013-2014 | 2014-2015 | |
I. Equipments | |||||||||
A. Boiler | |||||||||
Water Wall Tube Leakage | |||||||||
Super Heater Tube Leakage | |||||||||
Reheater Tube Leakage | |||||||||
Economiser Tube Leakage | |||||||||
Air Preheaters Problem | |||||||||
Boiler Operational Problems | |||||||||
(a) Furnace Fire Out/Flame Failure | |||||||||
(b) Furnce Draft Abnormal | |||||||||
(C)Drum Level High/Low | |||||||||
Others | |||||||||
Total Boiler | |||||||||
B. Turbine | |||||||||
Turbine Bearing Problem | |||||||||
Governing/Oil System Problem | |||||||||
Turbine Differential Expansion Problem | |||||||||
Turbine Axial Shift/Thrust Pad Problem | |||||||||
Turbine Eccentricity/High Vibration | |||||||||
Turbine Rotor Failure/Damaged | |||||||||
Turbine Control Valve Problem | |||||||||
Condenser Tube Leakage/Cleani | |||||||||
Main Steam Line Problem | |||||||||
Emergency Safety Valve Closer | |||||||||
Condenser Low Vaccum | |||||||||
H.P and L.T Bypass System | |||||||||
Turbine Misc. Problem | |||||||||
Total Turbine | |||||||||
C. Generator | |||||||||
Stator/Stator Earth Fault | |||||||||
Gen.Transformer Tripping/Damaged | |||||||||
Rotor/Rotor Earth Fault | |||||||||
Excitation Problem | |||||||||
Gen. Cooling System Failure | |||||||||
Seal Oil Systemk Problem | |||||||||
Generator Bearing Problem | |||||||||
Fire in Trubo Gen. Bushing/Bushing Failure | |||||||||
A.V.R. Problem | |||||||||
Generator Protection/Relay Operation Problem | |||||||||
Hydrogen Pressure Problem | |||||||||
Maintenance | |||||||||
Total Generator | |||||||||
II. Auxiliaries | |||||||||
A. Boiler Auxiliries | |||||||||
I.D Fans Problem | |||||||||
F.D Fans Problem | |||||||||
P.A Fans Problem | |||||||||
Milling System/RC Feeder Problem | |||||||||
Pipes and Valves Boiler Side | |||||||||
Boiler Aux. Misc. Problems | |||||||||
Total Boiler Aux. | |||||||||
B. Turbine Auxiliaries | |||||||||
Boiler Feed Pump/Motor Problem | |||||||||
Condensate Pump Problem | |||||||||
C.W Pump Problem | |||||||||
Regenerative System Problem | |||||||||
Turbine Pipes and Valves Problem | |||||||||
Deaerator Problem | |||||||||
Trubine Misc. | |||||||||
Total Turbine Aux. | |||||||||
Total Boiler and Turbine Aux. | |||||||||
III. Others Misc. Problems | |||||||||
A. Other Electrical Problems | |||||||||
Unit Aux. Transformer Station Transformer Problem | |||||||||
Gen. Transformer Tripping/Damaged | |||||||||
H.T./L.T. Supply Problem | |||||||||
DC Supply Problem | |||||||||
Switch Yard/Bus Bar Problem | |||||||||
Breker/Isolator Problem | |||||||||
Instrumentation Problem | |||||||||
Air Supply Problem | |||||||||
Electrical Miscellaneous Problems | |||||||||
Total Other Electrical Problems | |||||||||
Lignite Feeding Problem | |||||||||
Coal Feeding Problem | |||||||||
Wet/Poor Quality Coal | |||||||||
Fuel Old Problem | |||||||||
Cooling Tower Problem | |||||||||
Ash Handling System Problem | |||||||||
Other Misc. Problem | |||||||||
Fuel Supply and Other Misc. Problems | |||||||||
Coal Shortage | |||||||||
Total Fuel Supply and Other Misc Problem | |||||||||
C. Grid System | |||||||||
Transmission Constraints/Grid Disturbance | |||||||||
Reserve Shut Down | |||||||||
Total Grid System | |||||||||
Total Miscellaneous |