Estimated Installed Capacity, Peak Availability/Load, Energy Availability/ Requirement (Synchronisation Programme of 23308 MW) in India (1990-1991 to 1994-1995) | ||||||
Particulars | Units | |||||
1990-91 | 1991-92 | 1992-93 | 1993-94 | 1994-95 | ||
Installed Capacity | ||||||
Peak Availability | ||||||
Peak Load | ||||||
Surplus (Deficit) | ||||||
Energy Availability | ||||||
Energy Requirement | ||||||
Surplus (Deficit) | ||||||