Basin-wise Status of Hydro Electric Power Potential Development (In Terms of Installed Capacity-above 25 MW) in India (As on 30.09.2013) | ||||||||||
Basin | Identified Capacity as per Reassessment study | Capacity Under Operation | Capacity Under Construction | Capacity Under Operation+ Under Construction | Capacity yet to be taken up under construction | |||||
(Total MW) | Above 25 (MW) | (MW) | % | (MW) | (%) | (MW) | (%) | (MW) | % | |
Indus | ||||||||||
Ganga | ||||||||||
Central Indian Rivers | ||||||||||
West Flowing Rivers | ||||||||||
East Flowing Rivers | ||||||||||
Brahmaputra Basin | ||||||||||
India |