Basin-wise Status of Hydro Electric Power Potential Development (In Terms of Installed Capacity-Above 25 MW) in India (As on 31.03.2016 to 31.11.2021) | ||||||||||
Rivers Basin | Identified Capacity as Per Reassessment Study (In MW) | Capacity Developed | Capacity under Construction | Capacity under Operation + under Construction | Capacity Yet to be Developed | |||||
Total | Above 25 | In MW | In %age | In MW | In %age | In MW | In %age | In MW | In %age | |
31.03.2016 | ||||||||||
Indus | ||||||||||
Ganga | ||||||||||
Central Indian River System | ||||||||||
West Flowing Rivers System | ||||||||||
East Flowing Rivers System | ||||||||||
Brahmaputra | ||||||||||
Total | ||||||||||
31.03.2017 | ||||||||||
Indus | ||||||||||
Ganga | ||||||||||
Central Indian River System | ||||||||||
West Flowing Rivers System | ||||||||||
East Flowing Rivers System | ||||||||||
Brahmaputra | ||||||||||
Total | ||||||||||
31.03.2018 | ||||||||||
Indus | ||||||||||
Ganga | ||||||||||
Central Indian River System | ||||||||||
West Flowing Rivers System | ||||||||||
East Flowing Rivers System | ||||||||||
Brahmaputra | ||||||||||
Total | ||||||||||
31.03.2019 | ||||||||||
Indus | ||||||||||
Ganga | ||||||||||
Central Indian River System | ||||||||||
West Flowing Rivers System | ||||||||||
East Flowing Rivers System | ||||||||||
Brahmaputra | ||||||||||
Total | ||||||||||
30.09.2020 | ||||||||||
Indus | ||||||||||
Ganga | ||||||||||
Central Indian River System | ||||||||||
West Flowing Rivers System | ||||||||||
East Flowing Rivers System | ||||||||||
Brahmaputra | ||||||||||
Total | ||||||||||
31.11.2021 | ||||||||||
Indus | ||||||||||
Ganga | ||||||||||
Central Indian River System | ||||||||||
West Flowing Rivers System | ||||||||||
East Flowing Rivers System | ||||||||||
Brahmaputra | ||||||||||
Total |