Length and Cost of Ongoing National Highways (NHs) Projects in Odisha (As on 13.06.2014 to 03.03.2024) | ||||
Packages | Length (In Km.) | Sanction Cost (Rs. in Crore) | Appointed Date | Target Date of Completion |
4-Laning of Angul-Sambalpur Section of NH-42 (EPC) | ||||
4-Laning of Teleibani –Sambalpur Section of NH-6 (EPC) | ||||
4-Laning of Cuttack –Angul Section of NH-42 (EPC), Package – I | ||||
4-Laning of Cuttack –Angul Section of NH-42 (EPC), Pacakage– II | ||||
4-Laning of Rimuli-Koida Section of NH-215 (New Nh 520 (EPC) | ||||
4-Laning of Koida –Rajamunda Section of NH-215 (New NH 520) (EPC) | ||||
4-Laning of Biramitrapur-Brahmani Bridge End Section of NH-23 (EPC) | ||||
6-Laning of Chandikhole-Bhadrak Section of NH-5 (New Nh 16) (Ham) | ||||
6- Laning of Puintola to Tangi Section of NH-5 (New Nh 16) (EPC) | ||||
4-Laning of Rajamunda to Barkote Section of NH 23 (EPC) | ||||
4-Laning of Brahmani Bridge End to Rajamunda Section of NH-23 (EPC) | ||||
4-Laning of Talcher – Kamakhyanagar Section of NH- 200/23 (New NH 53) (EPC) | ||||
6- Laning of Tangi-Bhubaneswar Section of NH-5 (New NH 16) (EPC) | ||||
6-Laning of Bhadrak-Balasore Section of NH-5 (New NH 16) (Ham) | ||||
4-Laning of Duburi Chandikhole Section of NH-200 | ||||
3 Vups At Balikuda, Sikharpur & Badachana In Bhubaneswar- Chandikhole Section of NH-16 | ||||
Flyover at Hanspal of Chandikhole- Jagatpur Bhubaneswar Section of NH-5 | ||||
Construction of Vups At Km.11.330 (Kalabadia Chowk) and at Km.14.280 (Kuliana Village) In Balasore-Baripada-Jharpokharia Section of NH-5 | ||||
Balance Work of 4-Laning of Panikoili-Rimuli Section of NH-20 | ||||
6L Major Bridge Including Approaches from Km. 172.895 to Km. 173.670 of NH-520 | ||||
6L of Dhanara - Hatibena Section from Km. 124.611 to Km. 146.50 of NH-130-CD (Package – OD-1) | ||||
Widening and Strengthening to 2L+Ps from Km. 162/700 to Km. 192/450 (Amalabata to Tandikana) of NH-326 | ||||
Widening to 2L+Ps from Km. 0/00 to Km. 81/00 & Km. 93/00 to Km. 119/00 (Charichhak to Bhanjanagar) of NH-157 | ||||
Widening to 2L+Ps from Km. 50/0 to Km. 140/9 (Sonepur to Madhapur) of NH-57 | ||||
Widening to 2L+Ps from Km. 239/900 to 294/300 (Nayagarh to Khurda) of NH-57 | ||||
Widening & Strengthening to 2L+Ps from Km. 58/000 to 116/100 (Naktideul to Boudh) of Nh 153-B | ||||
Widening to 2L+Ps from Km. 0/000 to 41/055 (Chandili- Borigumma) of NH 63 | ||||
Widening to 2L+Ps from Km. 173/370 to 229/400 (Baliguda to Daringbadi) of NH-59 | ||||
Widening to 2L+Ps from Km. 269/300 to 328/200 (Jharsuguda to Bhojpur) of NH-49 | ||||
Widening to 2L+Ps from Km. 319/280 to 345/480 (Boriguma - Jeypore) of NH-26 | ||||
Widening to 2L+Ps from Km. 0/000 to 35/840 (Tiring to Rairangpur Section) of NH-220 | ||||
Widening to 2L+Ps from Km. 195/600 to 218/050 (Odisha- Chhatishgarh Border to Baldhiamalchhak) of NH-130C | ||||
Widening to 2L+Ps from Km. 294/280 to 319/280 (Nabarangpur to Borigumma) of NH-26 | ||||
Widening to 2L+Ps from Km. 296/500 to 336/500 (Mundamarai to Ratanpur Section) of NH-59 | ||||
Construction of Road from Km. 0/0 to 72/0 of NH-26 Such as 4 Lane from Km. 0/0 to 21/0 (Bargarh to Barpali) and 2L+Ps from Km. 21/0 to 72/0 (Barpali to Bolangir) | ||||
Strengthening to NH-26 from Km. 351/480 to 367/480 & from Km. 376/480 to 434/767 (Koraput to Sunki Ghat) | ||||
Strengthening to NH-326A from Km. 70/0 to Km. 102/90 | ||||
Strengthening to NH-326 from Km. 311/700 to 327/700 | ||||
Strengthening to NH-20 from Km. 0/0 to 14/0 (Champua-Rimuli) & Link Road to NH-20 from 14/0 to 14/69 (At Parsala) and Connecting Road from Rimuli Square at Km. 14/0 to 1/430 of NH-520 | ||||
Strengthening to NH-326 from Km. 413/700 to Km. 429/700 | ||||
Strengthening to Nh-326A from Km. 0/0 to 35/0 in the State of Odisha on EPC Basis. | ||||
Strengthening of Road from Km. 174/570 to 186/094 Km, 210/570 to 234/751 & Km. 235/748 to 243/648Km of NH-20” in the State of Odisha on EPC Basis | ||||
Strengthening of Existing Carriageway from Km. 277/461 to 280/249 Km, 281/400 to 286/725 Km, 287/883 Km. to 289/454 Km, 304/720 Km. to 341/741 Km. & Km. 346/000 to 360/391 Km. of NH-55” in the State of Odisha on EPC Basis | ||||
Construction of Truck Parking at Bijakhaman of Bolangir Town from Km. 79/700 to 80/00 Adjacent to NH- 26 in the State of Odisha. | ||||
Removal of Black Spot "Haladia Chhaka Areda" of NH-316 from Km. 12/900 to 13/400 and Black Spot "Nuanai Chhak" by Improving Road Safety through Improvement of Junction and Implementing Permanent Measures etc. | ||||
Reconstruction of Proposed High Level Bridge Over Pochaka Nallah at Km. 17/950 of NH-326 (Single Span of 18.00 MRCCT-Beam & Slab Bridge with Footpath) in the State of Odisha. | ||||
Rehabilitation of Tel Bridge Between 126/690 to 127/163 of NH- 26 Such as Providing Mastic Asphalt, BC, Crash Barriers for the Year 2019-20 in the State of Odisha | ||||
Re-Construction of Hi Bridge Over Kantyali Nallah at 47/200 Km. of NH-153B for the Year 2020-21 in the State of Odisha. | ||||
Rehabilitation and Upgrading to 2 Lanes /2 Lane with Paved Shoulder from Km. 90/0 to 158/0 (Nuapada to Bangomunda) of NH-217 under Phase-I of NHIIP . | ||||