Station-wise Status of Coal Supply to NTPC Power Plants in India (April-September, 2008) | ||||||||
(Figures in ` 000 MT) | ||||||||
Station | April-June | July-Sept | ||||||
Linkage | Receipt | % Materiali- station w.r.t. Linkage | Stock as on 30.06.08 (In Days) | Linkage | Receipt | % Materiali- station w.r.t Linkage | Stock as on 30.09.08 (In Days) | |
Singrauli Super Thermal Power Station | ||||||||
Korba Super Thermal Power Station | ||||||||
Ramgundam Super Thermal Power Station | ||||||||
Farakka Super Thermal Power Station | ||||||||
Kahalgaon Super Thermal Power Plant | ||||||||
Vindhychal Super Thermal Power Station | ||||||||
Rihand Super Thermal Power Station | ||||||||
Feroz Gandhi Unchahar Thermal Power Station | ||||||||
National Capital Power Project | ||||||||
Talcher Super Thermal Power Station | ||||||||
Tenughat Thermal Power Station | ||||||||
Talcher Super Thermal Power Station | ||||||||
Simhadri Super Thermal Power Station | ||||||||
Badarpur Thermal Power Station | ||||||||
Sipat Super Thermal Power Project | ||||||||
Total |