Allocation Made for Grid Connected Power Plants, Solar and Agricultural Pumps under Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan (PM-KUSUM) Scheme in Manipur (2020-2021) | |||
(In Mega Watt) | |||
States | Component-A Grid-Connected Power Plants up to 2 MW | Component-B Standalone Solar Pumps (Units) | Component-C Solarization of Existing Grid Based Agricultural Pumps (Units) |
Manipur | |||
India |