Scheme-wise Physical Target and Achievements for Power in Madhya Pradesh (1997-2002) | |||
Schemes | Units | Ninth Plan (1997-02) | |
Targets | Achievements | ||
Generation | |||
Hydel (MW) | |||
Rajghat Inter-State HEP (3X15 MW) | |||
Bansagar HEP | |||
Power House-II (2X15 MW) | |||
Power House-III (3X20 MW) | |||
Bhimgarh Mini Hydel Project (2X1.2 MW) | |||
Chambal Mini/Micro HEP (3X0.6 MW) | |||
Three Other Mini/Micro Hydel Projects (Korba-I 0.85 MW) Korba-II 1 MW, Asan Fall 2.7 MW | |||
Sub-Total (Hydel) | |||
Thermal (MW) | |||
Sanjay Gandhi TPS (Ext.-I (Unit 3 & 4) (2X210 MW) | |||
Sub-Total (Thermal) | |||
Grand Total (Generation) | |||
Transmission | |||
Increase in the Length of EHV Lines | |||
Increase in the Capacity of EHV Sub-Stations | |||
Sub-Transmission and Distribution | |||
33 K.V. Lines | |||
11 K.V. Lines | |||
Power Transformers | |||
Distribution Transformers | |||
Rural Electrification | |||
Village Electrified | |||
Pumps Energised | |||
Pumps for Which Lines Laid | |||
Electrification of Majra/Tolas | |||
Electrification of S.C. Bastis | |||
Single Light Point Connections in Rural Areas |