Minimum Rates of Wages and Special Allowances Revised (As on 1.10.2000) | |||||||||
(Rs. Per Day/Per Worker) | |||||||||
Category of Worker | Area "A" | Area "B" | Area "C" | ||||||
Basic Wage | Revised Special Allowance | Total Wage | Basic Wage | Revised Special Allowance | Total Wage | Basic Wage | Revised Special Allowance | Total Wage | |
I. Construction | |||||||||
Unskilled | |||||||||
Semi-skilled\Unskilled Supervisory | |||||||||
Skilled/Clerical | |||||||||
Highly Skilled | |||||||||
II. Agriculture | |||||||||
Unskilled | |||||||||
Semi-skilled\Unskilled Supervisory | |||||||||
Skilled/Clerical | |||||||||
Highly Skilled | |||||||||
III. Loading/Unloading and Ash Pit Cleaning in Railway | |||||||||
Unskilled | |||||||||
IV. Mining | |||||||||
Unskilled | |||||||||
Semi-skilled/Unskilled Supervisory | |||||||||
Skilled Clerical | |||||||||
Highly Skilled | |||||||||
V. Stone Breaking or Stone Crushing | |||||||||
Category | |||||||||
Excavation & removal of over burden with 50 metres lead/1.5 metres lift | |||||||||
Soft Soil | |||||||||
Soft Soil with rock | |||||||||
Rock | |||||||||
Removal and stacking of rejected stones with 50 metres lead/1.5 metres lift | |||||||||
Stone breaking or Stone crushing for the stone size of : | |||||||||
1.0 inch to 1.5 inches | |||||||||
Above 1.5 inches to 3.2 inches | |||||||||
Above 3.0 inches to 5.0 inches | |||||||||
Above 5.0 inches |