Station-wise Anticipated/Actual Power Generation of National Hydro Electric Power Corporation Limited (NHPC) in Karnataka (2012-2013) | ||||
(In MUs) | ||||
Power Station | Installed Capacity | Actual Generation (upto 30.11.2012) Including Auxiliary Consumption and Transformation loss | Likely to be Generated in Balance Period i.e Dec. 2012 to Mar. 2013 | Total Expected Generation During 2012-2013 |
Baira Siul | ||||
Loktak | ||||
Salal | ||||
Tanakpur | ||||
Chamera-I | ||||
URI | ||||
Rangit | ||||
Chamera-II | ||||
Dhauliganga | ||||
Dulhasti | ||||
Teesta-V | ||||
Sewa-II | ||||
Chamera-III | ||||
Total |