Sector/Station-wise Energy Plant Load Factor in Jharkhand (August, 2020) | |||||
Sector/Stations | Monitored Capacity (In MW) | Generation Target (2020-2021) (In GWh) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2019-2020) | |||
A. State Sector | |||||
Tenughat TPS | |||||
Tenughat Vidyut Nigam Limited (TVNL) Coal | |||||
State Sector Thermal | |||||
Subernrekha-I HPS | |||||
Subernrekha-II HPS | |||||
JUUNL Hydro | |||||
State Sector Hydro | |||||
B. Private Sector | |||||
Mahadev Prasad STPP | |||||
Adhunik Coal | |||||
Maitrishi Usha TPS | |||||
CPL Coal | |||||
Maithon RB TPP | |||||
Maithon Power Limited (MPL) Coal | |||||
Jojobera TPS | |||||
Tata PCL Coal | |||||
Private Sector Thermal | |||||
C. Central Sector | |||||
Bokaro `B TPS | |||||
Bokaro TPS `A Exp | |||||
Chandrapura (DVC) TPS | |||||
Kodarma TPP | |||||
DVC Coal | |||||
North Karanpura TPP | |||||
NTPC Ltd. COAL | |||||
Central Thermal | |||||
Panchet HPS | |||||
DVC Hydro | |||||
Central Hydro | |||||
Total Thermal | |||||
Total Hydro | |||||
Jharkhand | |||||
India |