Station-wise Allocation of Gas for Setting up of Gas Based Power Projects (State Sector) in India (As on 31.07.2010) | ||||
Power Station/Agency | Status (Expansion/ Greenfield) | Capacity (Mw) | Located In State | Gas Requirement at 90% PLF (MMSCMD) |
State Sector | ||||
Karimnagar | ||||
Dhuvaran Expn. | ||||
Hazira CCPP Extension | ||||
Chandramana CCPP, Patan, North Gujarat | ||||
Dudhva CCPP, Banaskantha, North Gujarat | ||||
Padra CCPP, Vadodra | ||||
CCGT project at Pipavav by GSPC Power company of GPPC (702 MW in 11th Plan & 351 MW in 12th Plan) | ||||
CCPP at Nawada,FARIDABAD ByM/s HPGCL | ||||
Govt of Karnataka | ||||
Cheemeni, Kasargod CCGT by KSIDCL | ||||
Uran Expansion | ||||
Ropar CCGT | ||||
Dholpur Extn. | ||||
Keshoraopatan | ||||
Govt of U.P. (UPPCL) | ||||
Govt. of Uttarakhand | ||||
Govt. of Madhya Pradesh | ||||
Sub-Total State Sector |