State-wise Status of Hydel Power Projects* Sanctioned in India (2001-2004) | |||||
Scheme/No. X MW | Sector | Installed Capacity (MW) | Date of Sanctioned/TEC | Cost of the Project | Likely Commissioning Schedule |
Jammu and Kashmir | |||||
Sewa Stage - II 3x40 | |||||
Himachal Pradesh | |||||
Parbati-II 4x200 | |||||
Uhl-II 2x50 | |||||
Kol Sam H.E. Project (4x200 MW) | |||||
Dhamwari Sunda 2x35 | |||||
Allain Dunhangan 2x96 | |||||
Karcham Wangtoo 4x250 | |||||
Untaranchal | |||||
Loharinag Pala 4x150 | |||||
Tapovan Vishnugad 4x130 | |||||
Madhya Pradesh | |||||
Omkareshwar 8x65 | |||||
Andhra Pradesh | |||||
Priyadarishini Jurala 6x39 | |||||
Karnataka | |||||
Almatti Dam 1x15+5x 55 | |||||
Varahi Extension 2x115 | |||||
Tamil Nadu | |||||
Bhavani Kattalai Barrage - III 2x15 | |||||
Orissa / Andhra Pradesh | |||||
Jalaput Dam Toe 3x6 | |||||
West Bengal | |||||
Tessta LD St-III 4x33 | |||||
Arunachal Pradesh | |||||
Subansiri Lower 8x250 | |||||
Kameng 4x150 | |||||
Meghalaya | |||||
Myntdu 2x42 | |||||
Total : |