Selected State/Sector/Agency-wise Status of Detailed Project Reports (DPRs) of Hydro-Electric Schemes Concurred/Appraised by Central Electricity Authority (CEA) in India (2008-2009 to 2011-2012-upto 31.12.2011) | ||
States/Sector/Agency | Installed Capacity (MW) | Date of CEA Concurrence |
Himachal Pradesh | ||
Kutehr | ||
Private/JSWEPL | ||
Sainj | ||
State/HPPCL | ||
Bajoli Holi | ||
Private/GMR | ||
Jammu and Kashmir | ||
Baglihar St-II | ||
State/JKPDC | ||
Uttarakhand | ||
Singoli Bhatwari | ||
Private/L and T | ||
Alaknanda | ||
Private/GMR | ||
Rupsiyabagar Khasiyabara | ||
Central/NTPC | ||
Vyasi | ||
State/UJVNL | ||
Karnataka | ||
Gundia | ||
State/KPCL | ||
Andhra Pradesh | ||
Indirasagar (Polavaram) | ||
State/APGENCO | ||
Arunachal Pradesh | ||
Demwe Lower | ||
Private/ADPL | ||
Dibbin | ||
Private/KSKDHL | ||
Nafra | ||
Private/SNEL | ||
Lower Siang | ||
Private/JAPL | ||
Nyamjang Chhu | ||
Private/BEL | ||
Tawang St-I | ||
Central/NHPC | ||
Tato-II | ||
Private/THPPL | ||
Tawang St-II | ||
Central/NHPC | ||
Sikkim | ||
Teesta St-IV | ||
Central/NHPC | ||
Panan | ||
Private/HHPL | ||
Mizoram | ||
Kolodyne St-II | ||
Central/NTPC | ||
Total |