Selected State/Project-wise Status of Construction of Hydro Electric Power (Above 25MW) having Time/Cost Overrun in India (As on 30.11.2018) | |||||||
(Rs. in Crore) | |||||||
State/Project/Installed Capacity/Executing Agency | Sector | Unit No. | Capacity (In MW) | Original Commissioning Schedule | Anticipated Commissioning Schedule | Original Cost | Latest Cost/Anticipated Completion Cost |
Arunachal Pradesh/Assam | |||||||
Subansiri Lower (8x250 = 2000 MW) NHPC | |||||||
Arunachal Pradesh | |||||||
Gongri 2x72= 144 MW Dirang Energy (P)Ltd | |||||||
Himachal Pradesh | |||||||
Tangnu Romai-I (2x22 = 44 MW) TRPGPL | |||||||
Sorang (2x50 = 100 MW) HSPPL | |||||||
Jammu and Kashmir | |||||||
Lower Kalnai 2x24= 48 MW JKSPDC | |||||||
Ratle (4x205+1x30) = 850 MW Ratle HEP Pvt .Ltd. | |||||||
Maharashtra | |||||||
Koyna Left Bank PSS 2x40 = 80 MW WRD, Maha | |||||||
Madhya Pradesh | |||||||
Maheshwar (10x40 = 400 MW) SMHPCL | |||||||
Sikkim | |||||||
Teesta Stage VI (4x125 = 500 MW) Lanco Energy Pvt. Ltd. | |||||||
Rangit-IV HE Project (3X40 = 120 MW) JPCL | |||||||
Panan 4x75= 300 MW Himagiri Hydro Energy Pvt. Ltd. | |||||||
Bhasmey 2x25.5=51 MW Gati Infrastructure | |||||||
Rangit-II 2x33=66 MW Sikkim Hydro Power Ltd. | |||||||
Uttarakhand | |||||||
Lata Tapovan (3x57 = 171 MW) NTPC | |||||||
Tehri PSS 4x250=1000 MW THDC | |||||||
Phata Byung 2x38=76 MW Lanco | |||||||
India |