Performance of Infrastructure Sector in India (2009-2010 to 2011-2012-upto December 2011) | ||||||
Infrastructure Sectors | 2009-10 | 2010-11 | 2011-12 (Upto Dec., 2011) | |||
Target | Actual | Target | Actual | Target | Actual | |
Power Generation (BU) | ||||||
Thermal Generation | ||||||
Nuclear Generation | ||||||
Hydro Generation | ||||||
Import from Bhutan | ||||||
Total | ||||||
Coal Production (MT) | ||||||
Coal India Ltd. | ||||||
Singareni | ||||||
Others | ||||||
Total | ||||||
Production of Finished Steel (` 000 Tonne) | ||||||
I. Main Producer | ||||||
SAIL | ||||||
Tata Steel | ||||||
VSP | ||||||
Total | ||||||
II. Major (Secondary) Producer | ||||||
Total (I+II) | ||||||
Cement Production (MT) | ||||||
Cement Production (MT) | ||||||
Ferilisers Production (` 000 Tonne) | ||||||
Nitrogen | ||||||
Phosphate | ||||||
Total | ||||||
Petroleum | ||||||
Crude Oil Prod. (MT) | ||||||
Refinery Prod. (MT) | ||||||
Natural Gas Prod. (MCM) | ||||||
Roads (Kms.) | ||||||
NHAI | ||||||
Widening/Strengthening/Existing Weak Pavement to Four/Six/Eight Lanes (Kms.) | ||||||
State PWD and Border Road Organisation (BRO) | ||||||
Improvement of Low Grade Section (Kms.) | ||||||
Strengthening of Existing Weak Pavement (Kms.) | ||||||
Widening to four Lanes (Kms.) | ||||||
Widening to two Lanes (Kms.) | ||||||
Railways | ||||||
Revenue Earning Goods Traffic (MT) | ||||||
Shipping | ||||||
Cargo Handled at Major Ports (MT) | ||||||
Coastal Shipment of Coal (MT) | ||||||
Civil Aviation | ||||||
Cargo Handled at Airports (In Metric Tonne) | ||||||
Export Cargo | ||||||
Import Cargo | ||||||
Passenger Traffic Handled at (In Lakh Nos.) | ||||||
International Terminals | ||||||
Domestic Terminals | ||||||
Telecommunications | ||||||
Net Addition in Switching Capacity (` 000 Lines) | ||||||
Net Telephone Connections Provided (` 000 Numbers) | ||||||
Net (New) Cell Phone Connections (` 000 Numbers) | ||||||
Total Connections (in ` 000 Number) |