Performance of Infrastructure Sector in India (2009-2010 to 2011-2012-upto December 2011) | ||||||
Sector | 2009-2010 | 2010-2011 | April-Dec. 2011-2012 | |||
Target | Actual | Target | Actual | Target | Actual | |
Power Generation (BU) | ||||||
Thermal Generation | ||||||
Hydro Generation | ||||||
Import From Bhutan | ||||||
Total | ||||||
Coal Production (MT) | ||||||
Coal India Ltd. | ||||||
Singareni | ||||||
Others | ||||||
Total | ||||||
Production of Finished Steel (` 000 Tonnes) | ||||||
Main Producer | ||||||
Sail | ||||||
Tata Steel | ||||||
VSP | ||||||
Total | ||||||
II. Major (Secondary) Producer | ||||||
Total (I + II ) | ||||||
Cement Production (MT) | ||||||
Cement Production (MT) | ||||||
Fertilizers Production (` 000 Tonnes) | ||||||
Nitrogen | ||||||
Phosphate | ||||||
Total | ||||||
Petroleum | ||||||
Crude Oil Prod. (MT) | ||||||
Refinery Prod. (MT) | ||||||
Natural Gas Prod. (MT) | ||||||
Road (Kms.) | ||||||
NHAI | ||||||
Widening/Strengthening/Existing Weak Pavement to Four/Six/ Eight (Kms.) | ||||||
State PWD and Border Road Organisation (BRO) | ||||||
Improvement of Low Grade Section (Kms.) | ||||||
Strengthening of Existing Weak Pavement (Kms.) | ||||||
Widening/ to Four Lanes (Kms.) | ||||||
Widening to Two Lanes (Kms.) | ||||||
Railways | ||||||
Revenue Earning Goods Traffic (MT) | ||||||
Shipping | ||||||
Cargo Handled at Major Port (MT) | ||||||
Coastal Shipment of Coal (MT) | ||||||
Civil Aviation | ||||||
Cargo Handled at Airports (In Metric Tonnes) | ||||||
Export Cargo | ||||||
Import Cargo | ||||||
Passenger Traffic Handled at (In Lakh Nos) | ||||||
International Terminals | ||||||
Domestic Terminals | ||||||
Tele-Communications | ||||||
Net Addition in Switching Capacity ( ` 000 Lines) | ||||||
Net Telephone Connections Provided ( ` 000 Number ) | ||||||
Net (New ) Cell Phone Connections ( ` 000 Number) | ||||||
Total Connections (II+III) (In ` 000 Number) |