Cost Sanctioned for Mumbai Urban Transport Project-Phase 3 (MUTP-3), Mumbai in Maharashtra (2021-2022) | |
Works | Cost Sanctioned (Rs. in Crore) |
New Suburban Railway Corridor Panvel-Karjat (Double Line) (28 Kms) | |
New Suburban Corridor Link between Airoli-Kalwa (Elevated) on Central Railway (4 Kms) | |
Quadrupling of the Virar-Dahanu Road on Western Railway (31.5 Kms) | |
Procurement of Rolling Stock (565 Coaches) | |
Trespass Control on Mid-section |