Capacity and Cost of Ongoing Private Sector/Captive/Joint Venture Port Projects (Major Ports) in India (As on 31.03.2020) | ||||
Projects | Ports | Capacity (In Million Tonne) | Project Cost (Rs. in Crore) | Project Status |
Extension of existing Container terminal in Outer Harbour. | ||||
Construction and Operation of general cargo berth No. 5 & 6 at Mormugao Port, Goa on BOOT basis. | ||||
Development of a Coal Import Terminal at Berth No.7 at Mormugao Port Goa on DBFOT basis | ||||
Redevelopment of Berths 8,9 and barge berth at the Port of Mormugao. | ||||
Oil Jetty No. 7 at Old Kandla | ||||
Oil Jetty No.8 at old kandla | ||||
Development of Marine Liquid Terminal facilities atOOT, Vadinar on captive use basis | ||||
Development of oil jetty to handle liquid cargo and ship bunkering terminal at old Kandla-PPP Mode | ||||
Development of Bulk Coal Terminal on Captive Basi | ||||
Provide Handling Equipment at Berth No.16 (Old B.No.12) for Handling Bulk Cargo & Containers under PPP Mode | ||||
Mechanization of Berth No. 14 by Providing Handling Equipment for Handling Container and Other Cargo on DBFOT Basis at NMPT | ||||
Development of fourth container terminal | ||||
Appointment of O&M operator for operation and maintenance of domestic cruise terminal at Mumbai Port. | ||||
Mechanization of EQ- 1.2 & 3berths at Paradip Port on BOT basis | ||||
Development of New Coal Berth for handling of Coal Import at Paradip Port onBOT basis. | ||||
Modification of existing Iron Ore Terminal to also handle Coal. | ||||
Up gradation of CJ-I and CJ- II (berth construction) | ||||
Widening of the ExistingKorampallam surplus course bridge and ROB | ||||
Development of barge Handling facility at Bharati Dock under PPP model | ||||
Berth No. 3 mechanization | ||||
Procurement of 1 No. Rail Mounted Quey Crane (RMQC) | ||||
Setting of 1 MW in solar power in township | ||||
Fly over at Ranichak | ||||
Widening and strengthening of concrete road from G.C Berth main gate no. 13 | ||||
Setting up of 2nd railway line from Durgachak to HDC railway system | ||||
Construction of Liquid Cargo handling Jetty( Outer Terminal-II) near 2nd oil jetty | ||||
Construction of hard stand with concrete power block including drainage facility behind Berth No. 5 (1.5 lakhsqm) | ||||
Development of container Stacking yard at northern side of 3 NSD shed adjacent green verge for creation of a New Reefer Park and other allied works at NSD (A/c KDS) | ||||
Reconstruction of Bay No.4 & 5 of the CPY / reconstruction of damaged portions of Bay No.1 CPY (excluding rail line portion) and other allied works(A/c KDS) | ||||
Development of area between 1 CPY & Reefer Park area adjoining green verge area for CPY including relocation of existing Fire line & Cable Duct etc. at NSDock (A/c KDS) |