Capacity and Cost of Ongoing Private Sector/Captive/Joint Venture Port Projects (Major Ports) in India (As on 30.09.2016) | |||
Projects | State/Port Name | Capacity (Million Tonnes) | Project Cost (Rs. in Crore) |
Development of Container Terminal on DBFOT Basis | |||
Development of Multi Cargo Terminal on DBFOT Basis | |||
Construction of Coal Berth No.3 | |||
Development of LNG Terminal | |||
Construction of Coal Berth-4 | |||
Construction of Two New Off-shore Container Berths & Development of Container Terminal Berth on BOT Basis in Mumbai Harbour. | |||
Multi-User Liquid Terminal (MULT) at Puthuvypeen SEZ (International Bunkering Terminal at Cochin) | |||
Setting up of Mechanized Iron Ore Handling Facilities at Berth No. 14 by M/s. SICAL Logistics Limited on BOT Basis. | |||
Development of Barge Handling Facility at Bharathi Dock | |||
Development of EQ-1A Berth on South Side of EQ-1 Berth in Inner Harbour for Handling Thermal Coal and Steam Coal | |||
Installation of Mechanized Fertilizer Handling Facilities at EQ-7 at Inner Harbor. | |||
Up-gradation of the Existing Facility (OHC) and Creating New Facility (WQ-1) for Iron ore Handling. | |||
Extension of Existing Container Terminal in Outer Harbor. | |||
Development of Deep Drought Coal Berth on BOT Basis | |||
Development of Multi-Purpose Berths to Handle Clean Cargo Including Container on BOT Basis at Paradip Port. | |||
Mechanization of EQ 1 to EQ 3 berths at Paradip Port on BOT basis. | |||
Development of Deep Draught Iron Ore Berth on BOT Basis at Paradip Pot. | |||
Conversion of Berth No. 8 as Container Terminal | |||
Construction of One Number of Shallow Draught Berth on DBFOT Basis. | |||
Development of North Cargo Berth II on DBFOT Basis. | |||
Development of North Cargo Berth III | |||
Development of North Cargo Berth IV | |||
Development of Fourth Container Terminal at JNP on DBFOT Basis | |||
Development of Standalone Handling Facility with a Quay Lngth of 330 m to the North at JNPT | |||
Redevelopment of Berths 8,9 and Barge Berth at the Port of Mormugao, Goa | |||
| |||
Abbr. : JNPT: Jawahar Lal Nehru Port. | |||
BOT : Build Operate and Transfer. | |||
BOO : Build Own Operate. | |||
DBFOT : Design, Build, Finance, Operate and Transfer. | |||
Note: The project status of Project name at S. No. 10, 13, 14, 15, 16, 17, 23 & 25 is updated on 30th September, 2016. |