Estimated Cost and Outlay under Plan Scheme for Construction of Storage Godowns in India (2012-2017) | |||
(Rs. in Crore) | |||
Head | Estimated Cost | Unspent Balance of 11th Plan | Outlay in 12th Plan |
Construction of Godowns by FCI at 37 Location in the NE (292730 MT) | |||
Construction of Godowns by FCI at 9 Location in 4 Other States (76220 MT) | |||
Grant-in Aid to NE States for Intermediate Storage at 74 Location. | |||
Grant-in Aid to Jammu and Kashmir for Intermediate Storage at 1 Location | |||
Total |