Station-wise Energy Plant Load Factor in Himachal Pradesh (October, 2018) | |||||
Sectors/Stations | Monitored Capacity (In MW) | Target (April 2018 to March 2019) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2017-2018) | |||
State Sector | |||||
Kashang Integrated HPS | |||||
Sainj HPS | |||||
Himachal Pradesh Power Co. Limited (HPPCL) Hydro | |||||
Bassi HPS | |||||
Giri Bata HPS | |||||
Larji HPS | |||||
Sanjay HPS | |||||
UHL-III HPS | |||||
Himachal Pradesh State Electricity Board Limited (HPSEB) Hydro | |||||
State Hydro | |||||
Private Sector | |||||
Allain Duhangan HPS | |||||
Allain Duhangan Hydro Project Limited ADHPL (ADHPL) Hydro | |||||
Malana-II HPS | |||||
EPPL Hydro | |||||
Budhil HPS | |||||
Greenco Budhil Hydro Power Pvt. Limited (GBHPPL) Hydro | |||||
Baspa HPS | |||||
Karcham Wangtoo HPS | |||||
Himachal Baspa Power Company Ltd. (HBPCL) Hydro | |||||
Sorang HPS | |||||
HSPCL Hydro | |||||
Chanju-I HPS | |||||
IAEPL Hydro | |||||
Malana HPS | |||||
Malana Power Company Ltd (MPCL) Hydro | |||||
Tidong HPS | |||||
NTPGPL Hydro | |||||
Private Hydro | |||||
Central Sector | |||||
Baira Siul HPS | |||||
Chamera-I HPS | |||||
Chamera-II HPS | |||||
Chamera-III HPS | |||||
Parbati-II HPS | |||||
Parbati-III HPS | |||||
NHPC Hydro | |||||
Koldam HPS | |||||
NTPC Ltd. Hydro | |||||
Nathpa Jhakri HPS | |||||
Rampur HPS | |||||
Satluj Jal Vidyut Nigam Limited (SJVNL) Hydro | |||||
Central Hydro | |||||
Total Hydro | |||||
Himachal Pradesh | |||||
India |