Sector/Station-wise Energy Plant Load Factor in Himachal Pradesh (August, 2020) | |||||
Sectors/Stations | Monitored Capacity (In MW) | Generation Target (2020-2021) (In GWh) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2019-2020) | |||
A. State Sector | |||||
Kashang Integrated HEP | |||||
Sainj HPS | |||||
Sawra Kuddu HPS | |||||
Himachal Pradesh Power Co. | |||||
Limited (HPPCL) Hydro | |||||
Bassi HPS | |||||
Giri Bata HPS | |||||
Larji HPS | |||||
Sanjay HPS | |||||
UHL-III HPS | |||||
Himachal Pradesh State Electricity | |||||
Board Limited (HPSEB) Hydro | |||||
Shanan HPS | |||||
PSPCL Hydro | |||||
State Sector Hydro | |||||
B. Private Sector | |||||
Allain Duhangan HPS | |||||
Allain Duhangan Hydro Project | |||||
Limited ADHPL (ADHPL) Hydro | |||||
Malana-II HPS | |||||
EPPL Hydro | |||||
Budhil HPS | |||||
Greenco Budhil Hydro Power | |||||
Pvt. Limited (GBHPPL) Hydro | |||||
Bajoli Holi HPS | |||||
GMR (BHHPL) Hydro | |||||
Baspa HPS | |||||
Karcham Wangtoo HPS | |||||
Himachal Baspa Power Company | |||||
Ltd. (HBPCL) Hydro | |||||
Sorang HPS | |||||
HSPCL Hydro | |||||
Chanju-I HPS | |||||
IAEPL Hydro | |||||
Malana HPS | |||||
Malana Power Company Ltd. | |||||
(MPCL) Hydro | |||||
Tidong HPS | |||||
NTPGPL Hydro | |||||
Private Sector Hydro | |||||
C. Central Sector | |||||
Bhakra Left HPS | |||||
Bhakra Right HPS | |||||
Dehar HPS | |||||
Pong HPS | |||||
BBMB Hydro | |||||
Baira Siul HPS | |||||
Chamera-I HPS | |||||
Chamera-II HPS | |||||
Chamera-III HPS | |||||
Parbati-II HPS | |||||
Parbati-III HPS | |||||
NHPC Hydro | |||||
Koldam | |||||
NTPC Ltd. Hydro | |||||
Nathpa Jhakri HPS | |||||
Rampur HPS | |||||
Satluj Jal Vidyut Nigam Limited | |||||
(SJVNL) Hydro | |||||
Central Hydro | |||||
Total Hydro | |||||
Himachal Pradesh | |||||
India |