Power House-wise Power Availability Position (Installed Capacity) in Himachal Pradesh (2014-2015) | ||||
Power Houses | Installed Capacity (In MW) | Effective Capacity (In MW) | H.P Shares | |
(In %age) | (In MW) | |||
Own Hydro | ||||
Bhaba (3x40MW) | ||||
Bassi (1x15MW+3x16.50MW) | ||||
Giri (2x30MW) | ||||
Andhra (3x5.6MW) | ||||
Baner (3x4MW) | ||||
Gaj (3x3.5MW) | ||||
Binwa (2x3Mw) | ||||
Thirot (3x1.5MW) | ||||
Micros | ||||
Ghanvi (2x11.25MW) | ||||
Gumma (2x1.5MW) | ||||
Holi (2x1.5MW) | ||||
Larji (3x42) | ||||
Khauli (2x6) | ||||
Bhaba Aug. PH | ||||
Ghanvi-II | ||||
Total (A) | ||||
Own Diesel | ||||
Keylong | ||||
Tabo | ||||
Rangrik | ||||
Total (B) | ||||
Total (A+B) | ||||
Shared Generation in Other Projects | ||||
BBMB Stations | ||||
Bhakra Old HP Share | ||||
Bhakra Complex | ||||
Dehar | ||||
Pong | ||||
Total (I) | ||||
NHPC Stations | ||||
Chamera-I | ||||
Tanakpura (120MW) | ||||
Salal | ||||
Uri (480 MW) | ||||
Chamera-II | ||||
Dhauliganga | ||||
Chamera-III | ||||
Parbati-III | ||||
Total (II) | ||||
NTPC Projects/Stations | ||||
Coal Fired | ||||
Rihand-I | ||||
Rihand-II | ||||
Rihand-III | ||||
Unchahar-I | ||||
Unchahar-II | ||||
Unchahar-III | ||||
Kahalgaon-II | ||||
Total (A) | ||||
Gas Fired | ||||
Anta Gas | ||||
Auriya Gas | ||||
Dadri Gas | ||||
Total (B) | ||||
Sub-Total (iii) (A+B) | ||||
UJVML/UPJVNL Stations | ||||
Dhakarani (UJVNL) | ||||
Dhalipur (UJVNL) | ||||
Chibro (UJVNL) | ||||
Khaodri (UJVNL) | ||||
Kulhal (UJVNL) | ||||
Khara (UPJVNL) | ||||
Total (iv) | ||||
PSEB Stations | ||||
Shanan | ||||
Shanan (Ext.) | ||||
Total (v) | ||||
NPC Projects | ||||
Narora | ||||
RAPS (5&6) | ||||
Total (vi) | ||||
IPP Stations | ||||
Baspa-II HEP | ||||
Patikari HEP | ||||
Toss HEP | ||||
Upper Joiner | ||||
Sarvari-II | ||||
Sumez | ||||
Neugal | ||||
Beas Kund-i | ||||
Kurmi | ||||
Jogini | ||||
Nanti | ||||
Total (vii) | ||||
Joint Venture Projects | ||||
Nathpa Jhakri Project | ||||
Tehri HEP (THDC) | ||||
Koteshwar (THDC) | ||||
Rampur HEB | ||||
Sub-Total (vii) | ||||
Total (i+vii) | ||||
SHPs <5MW Capacity | ||||
Grand Total |