Station-wise Energy Plant Load Factor in Haryana (2018-2019-upto August 2018) | |||||
State/Sectors/Stations | Monitored Capacity (In MW) | Target (April 2018 to March 2019) | Plant Load Factor (In %age) | ||
Program | Actual | Actual Same Month (2017-2018) | |||
State Sector | |||||
Panipat TPS | |||||
Rajiv Gandhi TPS | |||||
Yamuna Nagar TPS | |||||
HPGCL Coal | |||||
State Thermal | |||||
Private Sector | |||||
Mahatma Gandhi TPS | |||||
JHPL (Hr.) Coal | |||||
Private Thermal | |||||
Central Sector | |||||
Indira Gandhi STPP | |||||
Aravali Power Corporation Pvt.Ltd. (APCPL) Coal | |||||
Central Thermal | |||||
Faridabad CCPP | |||||
National Thermal Power Corporation Ltd (NTPCL) Natural | |||||
Central Natural | |||||
Haryana Thermal | |||||
Haryana Natural | |||||
Haryana | |||||
India |