Status of Ongoing/Pending Railway Projects in Gujarat (As on 31.03.2012) | ||||
(Rs. in Crore) | ||||
Projects | Year of Inclusion in the Budget | Expenditure Incurred (Upto 31.03.2012) | Outlay Proposed in the Current Budget 2012-13 | Status |
New Line | ||||
Dahod-Indore via Sardarpur, Dhar (200.97 Km.) | ||||
Chhotaudepur-Dhar (157 Km.) | ||||
Gauge Conversion | ||||
Ahmedabad-Himmatnagar-Udaipur (299.20 km.) and New Line from Modasa-Shamlaji (22.53 km.) | ||||
Bhuj-Naliya (101.35 km) with Extension to Vayor (24.65 km.) | ||||
Rajkot-Veraval, Wansjaliya- Jetalsar, Veraval-Somnath, Shapur-Saradiya, Somnath-Kodinar (321.61 km GC +41.93 km NL =363.54 km.) | ||||
Bhildi-Viramgam with New Material Modification for Mehsana- Taranga Hill (57.4 km) Gauge Conversion with New Line from Patan-Bhildi (162 km. GC + 51.03 NL= Total 213.03 km.) | ||||
Miyagaon-Karjan-Dhaboi-Shamlya (96.46 km.) | ||||
Doubling | ||||
Udhna- Jalgaon with Electrification (306.93 km.) | ||||
Viramgam- Surendranagar (65.26 km.) | ||||
Viramgam- Samakhiali (182.23 km.) | ||||
Surat-Kosamba (35 km.) | ||||
Abu Road-Sarotra Road (23.12 km.) | ||||
Sarotra Road-Karjoda (23.59 km.) |