Installed Capacity and Actual Generation of Hydro Electric Stations (Installed Capacity Above 25 MW) in Gujarat (2016-2017 to 2019-2020-upto 30.05.2019) | |||||
Station/Utility | Installed Capacity (In Mega Watt) As on 30.05.2019 | Generation (In Million Unit) | |||
2016-2017 | 2017-2018 | 2018-2019 | 2019-2020 (upto 30.05.2019) | ||
Gujarat State Electricity Corporation Limited (GSECL) | |||||
Kadana PSS | |||||
Ukai | |||||
Total | |||||
Sardar Sarovar Narmada Nigam Ltd (SSNNL) | |||||
Sardar Sarovar CHPH | |||||
Sardar Sarovar RBPH | |||||
Total | |||||
Total Chhattisgarh | |||||
India |