Extent of Time/Cost Overrun in Projects with Respect to Original Schedule in Gujarat (As on 1.7.2002) | ||||||||||||
State | No. of Projects | Total Cost (Rs. CRS) | Project with Cost Over Run | Project with Time Over Run | ||||||||
Original | Anti- cipated Cost | Cost Over Run (%) | Number | Original | Anti- cipated Cost | % INCR Base | Number | Original | Anti- cipated Cost | Range (Months) | ||
Gujarat | ||||||||||||
India |