Scheme-wise Fund Allocation under NEC in North Eastern States of India (2006-2007 and 2007-2008) | ||||
(Rs. in Lakh) | ||||
Schemes Selected for Implementation | No. | States | Funds | |
2006-07 | 2007-08 | |||
System Improvement Schemes | ||||
Construction of 33 KV Express Line from Old Ziro to Tamen (45 KM) with 2X3.15 MVA, 33/11 S/s at Tamen in Arunachal Pradesh | ||||
Construction of the LILO 132KV D/C from Stage-IV to Sarusajai line (4.08 Km) at Umtru Switchyard in Meghalaya | ||||
Construction of 132 KV S/c Transmission Line on D/C tower from Agia (Assam) to Nangalbibra (Megh), (110KM) | ||||
Renovation & Modernization of the Protection System of Power Stations and 132 KV Grid Substations of MeSEB | ||||
Construction of 2.5 MVA, 33/11KV Sub-Station at Zokhawsang, Assam Rifles Complex Area, Mizoram | ||||
LT Overhead Lines with Aerial Bunched Cables for Aizawl (10 Km). | ||||
Extension of One 66 KV Bay at 66/11 KV Switchyard at Gyalshing and construction of 66/11 KV, 1x5 MVA Substation at Sardung (Yangthang) in West Sikkim | ||||
Interconnection of 11 KV Development Area Sub-Station with 11/11 KV TNA Sub-Station as part of Ring Main Network, Gangtok | ||||
Design, Supply, Erection, Testing, Commission of 2x3.5 MVA, 3.3/66 KV Switchyard cum Substation at Rongli HEP together with Construction of one 66 KV Line Bay from Rongli HEP | ||||
Upgradation & Conversion of Existing dedicated 3.3 KV System into 11 KV System of Gangtok, Sikkim | ||||
Power Sector (Generation) | ||||
1X21 MW Baramura Unit-V Gas Based Power Project", Tripura. | ||||
System Improvement Schemes | ||||
Improvement & Renovation Including Relignment of Existing 33 KV Line from Pasighat to Mebo and Construction of Tower over River Siang & Siku. | ||||
Augmentation and Improvement of LT distribution System in and Around Hapoli township Area (ZIRO), Arunachal Pradesh. | ||||
System improvement of Electrical Installation under Naharlagun Electrical Division, Nirjuli. | ||||
Installation of Capacitor Bank at 33 KV Umtru Switchyard & 132 KV EPIP-I at Byrnihat. | ||||
Remodelling and augmentation of HT & LY Power Supply & Distinction System at Pakyong Bazaaar, East Sikkim | ||||
Upgradation & Remodelling of Existing Distribution System of MG Road and its surrounding Areas, Gangtok, Sikkim | ||||
RRE | ||||
Lunggnit Small Hydro Electric Project, Stg-I & II (2x1.5 MWeach) | ||||
Installation of 1x10 MW each Capacity Wind-Solar Hybrid System for Four Villages, Manipur | ||||
Lakhroh Mini Hydel Project (lxl .5 MW) |