Project-wise Estimated Cost, Amount Approved and Released under National Clean Energy Funds (NCEF) in India (2011-2012 to 2015-2016) | |||
Scheme | Project Cost (In Crore) | Cost to be Funded From NCEF Approved by IMG (In Crore) | NCEF Support Received (In Crore) up to 2014-15 |
2011-12 | |||
Solar Water Heaters: Installation of Solar Water Heating System With Cumulative Collector Area of 162500 sq.m.in 16 Different States of the Country. | |||
Installation of SPV System in the States of Chhattisgarh, Jammu and Kashmir, Rajasthan, Sikkim, UP and Aggregating to 8.229 MWp | |||
Refinancing through NABARD: For Solar Home Lights and Small Capacity Systems under the Subsidy-cum-refinance Scheme Being Implemented Through NABARD. | |||
Bihar Saurkranti Sichai Yojana (Pilot Project) to Install 560nos. of Soler PV Water Pumping System in the Villages in 6 States/UTss of Bihar | |||
Funding for off-grid SPV Systems: to be Installed under JNNSM in 9 Villages of North 24 Paragana States/UTs, West Bengal | |||
Total | |||
2012-13 | |||
Installation of SPV Power Plants up to Size of 500 kwp with Aggregate Capacity of 10 MWp | |||
Financial Support for Extending Subsidy: for Installation of Solar Photovoltaic Lights and Small Capacity Systems Through NABARD | |||
Installation of Solar Photovoltaic Power Plants: Aggregating to 4 MWp Capacity at Different Indian Railway Locations | |||
Viability Gap Funding for Setting up 750 Mw Grid Connected Solar PV Power Projects under JNNSM | |||
Total | |||
2013-14 | |||
Installation of Solar Water Heating System, 20,000 Home Lighting System (Model 2) and 2,000 Solar Street Lights through NHB | |||
Market Development of Medium and High Temperature Concentrated Solar Technology (CSTs) for Community Cooking, Process Heat and Cooling Applications | |||
Localization of Solar Energy through Local Assembly, Sale and Usage of 1 Million Solar Study Lamps | |||
Installation of 23,500 Nos. SPV Power Plants of 1 KWp Capacity Each for Domestic Household in Rajasthan, Andhra Pradesh, Kerala, Tamilnadu, Chhattisgarh and Other Selected States. | |||
Installation of 17,500 SPV water Pumping System in Rajasthan, Tamilnadu, Andhra Pradesh, Uttar Pradesh, Bihar and Other Selected States to Meet the Irrigation Requirements | |||
Installation of Solar Water Heating Systems with Cumulative Collector area of 4,00,000 Sq. m. for Institutional and Idustrial sector in the Different States of the Country. | |||
Installation of Grid Connected Rooftop Solar Photovoltaic Power Plans with Aggregate 50 MWP Capacity in Various States Across the Country on Pilot Basis. | |||
5x100 KWp SPV Power Plants from Deogarh to Basukinath Alongwith 2500 Nos. LED Street Lights | |||
Financial Support for Extending Subsidy for Installation of Solar Photovoltaic Lights and Small Capacity Systems through NABARD, RRBs, Nationalised Banks and Cooperative Banks under Jawaharlal Nehru National Solar Mission (JNNSM). | |||
National Clean Energy Fund (NCEF)-Indian Renewable Energy Development Agency (IREDA) Concessional Funding Support for Renewable Energy. | |||
Total | |||
2014-15 | |||
52 MWp Grid Connected Rooftop SPV Plants through Multi Govt. Agencies | |||
54 MWp Grid Connected Rooftop SPV Power Plants through State Nodal agencies | |||
Installation of 5 Lakh sq.m. Collector area Solar Water Heating System in Domestic and Building Sector | |||
Setting up 1000 MW of Grid-connected Solar PV Power Projects by Establishments of Ministry of Defence (Project Size Later Reduced to Half (500 MW), Accordingly the NCEF Support Required will be Rs. 1250 Crore) | |||
25 MWp SPV Plan through SNAs and Channel Partners | |||
Generation Based Incentive (GBI) for Grid Connected Wind Power Projects | |||
73 MWp Grid Connected Rooftop SPV Power Plants in the Warehouses through Solar Energy Corporation of India (SECI) | |||
Setting up 1000 MW of Grid-connected Solar PV Power Project by CPSUs | |||
IREDA to on lend to viable RE projects under NCEF | |||
Intra-State Transmission System for Renewable Power Evacuation in Rajasthan | |||
Intra-State Transmission System for Renewable Power Evacuation in Tamil Nadu | |||
Installation of Solar Power Generator above 3 Wp up to Size of 100 kWp (with or without Battery) with Aggregate Capacity of 25 MWp Through SNAs and Channel Partners | |||
Solar Electrification of 1000 villages under JNNSM | |||
Provision of Solar Power in Border Areas | |||
Setting up of 1000 MW of Grid Connected Solar PV Power Projects with Viability Gap Funding under Jawaharlal Nehru National Solar Mission (JNNSM) | |||
India`s Matching Contribution to PACE Setter Fund | |||
Total | |||
2015-16 | |||
In STS for Renewable Power Evacuation in Andhra Pradesh | |||
In STS for Renewable Power Evacuation in Himachal Pradesh | |||
In STS for Renewable Power Evacuation in Gujarat | |||
In STS for Renewable Power Evacuation in Karnataka | |||
In STS for Renewable Power Evacuation in Madhya Pradesh | |||
In STS for Renewable Power Evacuation in Maharashtra | |||
Setting-up of 5000 MW of Grid Connected Solar PV Power Projects With VGF under Batch-I of Phase-II of JNNSM | |||
Grid Connected Rooftop and Small Solar Power Plants Programme (40000 MW) | |||
Decentralised Generation of Renewable Energy {With Special Emphasis on Unemployed Youths and Village Panchayats (10000 MW)} | |||
Total | |||
Grand Total |