Loans (Govt. Loans)/Credits Received (from Japan) by India (Upto 31.03.2010) | ||||||||||
(Currency : Millions Japanese Yen) | ||||||||||
Loan | Value of Aggre- ment Signed Less Cance- llation | Un- drawn Balance As on 01.04. 2009 | Utilisation | Un- drawn Balance As on 31.03. 2010 | Principal Repaid | Closing Debt Out- standing As on 31.03. 2010 | Payment on Interest | |||
During 2009- 10 | Upto 31.03. 2010 | During 2009- 10 | Upto 31.03. 2010 | During 2009- 10 | Upto 31.03. 2010 | |||||
1956-1961 Second Five Year Plan | ||||||||||
JPGL001 First Yen Credit Dtd.4.2.1958 (2/4/1958) | ||||||||||
Plan Year Total | ||||||||||
1961-1966 Third Five Year Plan | ||||||||||
JPGL002 Second Yen Credit Dtd.18.8.61 (8/18/1961) | ||||||||||
JPGL003 Third Yen Credit Dt.24.10.63 (10/24/1963) | ||||||||||
JPGL004 Fourth Yen Credit Dt.3.9.64 (9/3/1964) | ||||||||||
JPGL005 Fifth Yen Credit Dt. 25-6-65 (6/25/1965) | ||||||||||
Plan Year Total | ||||||||||
1966-1967 Yearly Plan | ||||||||||
JPGL006 Sixth Yen Credit Dtd.16.12.66 | ||||||||||
Plan Year Total | ||||||||||
1967-1968 Yearly Plan | ||||||||||
JPGL007 Seventh Yen Credit Dtd.5.9.67 (9/5/1967) | ||||||||||
JPGL015 Food Production Aid Credit Dt.14-4-67 (4/10/1967) | ||||||||||
Plan Year Total | ||||||||||
1968-1969 Yearly Plan | ||||||||||
JPGL008 Eighth Yen Credit Dtd.14.2.69 (2/14/1969) | ||||||||||
Plan Year Total | ||||||||||
1969-1974 Fourth Five Year Plan | ||||||||||
11th Yen Credit (2/1/1972) | ||||||||||
12th Yen Deep Sea Oil Project Addition (2/2/1973) | ||||||||||
Deep Oil Exploration Proj. (1/30/1974) | ||||||||||
10th Yen Credit (4/20/1971) | ||||||||||
11th Yen Credit (2/1/1972) | ||||||||||
12th Yen Credit (2/2/1973) | ||||||||||
JPGL009 Nineth Yen Credit Dtd.3.3.70 (3/3/1970) | ||||||||||
JPGL016 V.O.H. Credit Dt.28.7.70 (7/28/1970) | ||||||||||
JPGL017 Deep Sea Oil Project Dt. 11.5.71 (5/11/1971) | ||||||||||
Plan Year Total | ||||||||||
1974-1978 Fifth Five Year Plan | ||||||||||
Bhatinda Fertilizer Proj. (8/2/1974) | ||||||||||
13th Yen Credit (4/19/1974) | ||||||||||
IDC-001 Commodity Loan I (3/31/1976) | ||||||||||
IDC-002 Commodity Loan II (3/3/1977) | ||||||||||
IDC-003 Commodity Loan III (8/19/1977) | ||||||||||
IDP-001 Telecom Project (4/5/1977) | ||||||||||
INDIA-R-74Resheduled Loans For Yen Credits (3/5/1975) | ||||||||||
INDIA-R-75Resheduled Loans For Yen Credits (9/12/1975) | ||||||||||
INDIA-R-76Resheduled Loans For Yen Credits (12/15/1976) | ||||||||||
JPGL014 14th Yen Credit Commodity Aid (3/5/1975) | ||||||||||
JPGL022 Panipat Fertilizer Project (4/10/1975) | ||||||||||
JPGL023 Adhoc Credit for Bhatinda Panipat Project (9/12/1975) | ||||||||||
Plan Year Total | ||||||||||
1978-1979 Yearly Plan | ||||||||||
IDC-004 Commodity Loan IV (10/6/1978) | ||||||||||
IDP-002 N S Hydro Elect Project (6/13/1978) | ||||||||||
IDP-003 Paithon Hydro Elect Project (8/10/1978) | ||||||||||
Plan Year Total | ||||||||||
1979-1980 Yearly Plan | ||||||||||
IDP-004 Bombay High Oil Exploration (3/4/1980) | ||||||||||
Plan Year Total | ||||||||||
1980-1985 Sixth Five Year Plan | ||||||||||
IDP-005 Telecom Project (5/8/1980) | ||||||||||
IDP-006 Bombay Offshore Oil Dev. Project (6/7/1980) | ||||||||||
IDP-007 Western Yamuna Canal Hydro Elec.Pj (3/19/1981) | ||||||||||
IDP-008 Hazira Fertilizer Project (5/7/1981) | ||||||||||
IDP-009 Chandarpur Thermal Power Stn.Expansion Project (6/2/1981) | ||||||||||
IDP-010 Thal Vaishat Fertilizer Project (9/24/1981) | ||||||||||
IDP-011 Telecommunication Project III (10/15/1981) | ||||||||||
IDP-012 Telecommunication Project. IV (10/15/1981) | ||||||||||
IDP-013 Nagarjuna Sagar Hydro Ele. Project (10/15/1981) | ||||||||||
IDP-014 Lower Mettur Hydroelectric Project (10/15/1981) | ||||||||||
IDP-015 Lower Berpani Hydro Electric Project (10/15/1981) | ||||||||||
IDP-016 Hirakund Hydro Elec. Project (10/15/1981) | ||||||||||
IDP-017 Indian Railways development Project (5/14/1982) | ||||||||||
IDP-018 Bombay Suberban Railway Modification Project (5/14/1982) | ||||||||||
IDP-019 Fifth Telecom Project (5/14/1982) | ||||||||||
IDP-020 UPSEB Project (12/26/1984) | ||||||||||
IDP-021 ONGC Offshore Supply Vessal Project (2/22/1983) | ||||||||||
IDP-022 Calcutta Metro Railways Project (2/22/1983) | ||||||||||
IDP-023 TNEB Micro Hydro Power Project (2/23/1983) | ||||||||||
IDP-024 Bijapur Fertilizer Project (9/11/1984) | ||||||||||
IDP-025 Ammonium Sulphate Project (9/11/1984) | ||||||||||
IDP-027 Telecom Project-VI (9/11/1984) | ||||||||||
IDP-028 Anola Fertilizer Project (12/26/1984) | ||||||||||
IDP-029 Telecom Project VII (12/26/1984) | ||||||||||
IDP-030 Gas Pipe Line Project I (12/26/1984) | ||||||||||
IDP-031 Eastern Gundak Hyway Project (12/26/1984) | ||||||||||
Plan Year Total | ||||||||||
1985-1990 Seventh Five Year Plan | ||||||||||
IDC-005 Commodity Loan V Dt.21.12.87 (12/21/1987) | ||||||||||
IDP-032 Telecom Project VIII (11/25/1985) | ||||||||||
IDP-033 Sardar Sarovar Hydro Electric Project (11/25/1985) | ||||||||||
IDP-034 Ujjaini Hydro Electric Project (11/25/1985) | ||||||||||
IDP-035 Anola Fert.Project II (11/25/1985) | ||||||||||
IDP-036 Dt.25-11-85 Gas Pipeline Proj.II (11/25/1985) | ||||||||||
IDP-037 Gas Pipeline Project III Dt.18-2-86 (12/18/1986) | ||||||||||
IDP-038 Anola Fert. Project III Dt.18-12-86 (12/18/1986) | ||||||||||
IDP-039 Telcom Net-work Project Dt.18-12-86 (12/18/1986) | ||||||||||
IDP-040 Teesta Canal Hydro Electric Project Dt.18-12-86 (12/18/1986) | ||||||||||
IDP-041 Haldia Port Modification Project Dt.18-12-86 (12/18/1986) | ||||||||||
IDP-042 Assam Gasturbine Dt.18-3-87 (3/18/1987) | ||||||||||
IDP-043 APGENCO (2/10/1988) | ||||||||||
IDP-044 Purlia Pumped Storage Dt.10-2-88 (2/10/1988) | ||||||||||
IDP-045 UPSEB (2/10/1988) | ||||||||||
IDP-046 PGCL-SH (2/10/1988) | ||||||||||
IDP-047 TNSID Corpn. Project Dt.10.02.88 (2/10/1988) | ||||||||||
IDP-048 HCL (1/12/1990) | ||||||||||
IDP-049 Telecom Project X Dt.10.02.88 (2/10/1988) | ||||||||||
IDP-051 FACT Captive Power Project Dt.10.02.88 (2/10/1988) | ||||||||||
IDP-052 Raichur T.P.Project Dt.15.12.88 (12/15/1988) | ||||||||||
IDP-053 Ghatghar T.P.Project Dt.15.12.88 (12/15/1988) | ||||||||||
IDP-054 Ministry of Tourisam (12/15/1988) | ||||||||||
IDP-055 Small Scale Dev.Project Dt.15.12.88 (12/15/1988) | ||||||||||
IDP-056 Upper Kolab Irrigation Project Dt.15.12.88 (12/15/1988) | ||||||||||
IDP-057 Upper Indravati IrrigationProject Dt.15.12.88 (12/15/1988) | ||||||||||
IDP-059 Mysore Paper Mill Project Dt.15.12.88 (12/15/1988) | ||||||||||
IDP-061 Burnpur Steel Plant Dt.06.01.89 (1/6/1989) | ||||||||||
IDP-062 TNSEB (3/27/1990) | ||||||||||
IDP-063 NTPC (3/27/1990) | ||||||||||
IDP-069 Indira Gandhi Nahar Project (3/27/1990) | ||||||||||
IDP-070 Kolaghat TPS Fly Ash Utilisn. Project (3/27/1990) | ||||||||||
Plan Year Total | ||||||||||
1990-1991 Yearly Plan | ||||||||||
IDP-066 Power System & Small Hydro Proj. (1/23/1991) | ||||||||||
IDP-071 UPSEB (1/23/1991) | ||||||||||
IDP-072 Teesta Canal Hydro. Project (1/23/1991) | ||||||||||
IDP-073 Afforestation Dev.Project (IG Nahar} (1/23/1991) | ||||||||||
IDP-074 Quality Control Health Technology (1/23/1991) | ||||||||||
IDP-075 Small Scale Industries Development Project (1/23/1991) | ||||||||||
IDP-076 Housing Programme (NHB) (1/23/1991) | ||||||||||
Plan Year Total | ||||||||||
1991-1992 Yearly Plan | ||||||||||
IDC-006 Emergenct Commodity Dt.31.5.91 (5/31/1991) | ||||||||||
IDP-065 UPSEB (6/13/1991) | ||||||||||
IDP-077 Small Scale Industries Dev.III (6/14/1991) | ||||||||||
IDP-078 NTPC (1/9/1992) | ||||||||||
IDP-079 Urban City Water Supply Project (1/9/1992) | ||||||||||
IDP-080 Afforestation of Aravalli Hills (1/9/1992) | ||||||||||
IDP-081 National Highway (Mathur-Agra) (1/9/1992) | ||||||||||
IDP-082 Ajanta Ellora Conservation Proj. (1/9/1992) | ||||||||||
Plan Year Total | ||||||||||
1992-1997 Eigth Five Year Plan | ||||||||||
IDC-007 Hydro-Carbon Sector Programme (12/3/1992) | ||||||||||
IDP-083 Anpara B Thermal Power Proj.IV (12/3/1992) | ||||||||||
IDP-084 Yamuna Action Plan Dt.21.12.92 (12/21/1992) | ||||||||||
IDP-085 Srisailam Power Transmission System (12/21/1992) | ||||||||||
IDP-086 Gandhar Gas based C.C.P. Project (12/21/1992) | ||||||||||
IDP-087 Udyogmandal Ammonia Replacement Project (12/21/1992) | ||||||||||
IDP-088 Anpara B T.P.Projectdt 24.01.94. (1/24/1994) | ||||||||||
IDP-089 Bkreswar T.P Project Dt.24.01.94 (1/24/1994) | ||||||||||
IDP-090 Faridabad G.B.P.S&ATSP Dt.24.01.94 (1/24/1994) | ||||||||||
IDP-091 Yamuna Bridge at Naini Dt.24.01.94 (1/24/1994) | ||||||||||
IDP-092 NH 5 Improvement Proj.Dt.24-01-94 (1/24/1994) | ||||||||||
IDP-093 SSI Dev.Program IV Dt.24.01.94 (1/24/1994) | ||||||||||
IDP-094 Srirailam Left bank P.S.P.II (2/28/1995) | ||||||||||
IDP-095 Srisailam Left bank T. P.S. Project (2/28/1995) | ||||||||||
IDP-096 Assam Gas TPS & Tansmission (2/28/1995) | ||||||||||
IDP-097 Bakreswar T.P.S.& Extension Project (2/28/1995) | ||||||||||
IDP-098 Purulia Pumped Storage Project (2/28/1995) | ||||||||||
IDP-099 Kothagudem `A TPS Project (2/28/1995) | ||||||||||
IDP-100 National Highway Improvment Program II (2/28/1995) | ||||||||||
IDP-101 National Highway-24 Improvement Project (2/28/1995) | ||||||||||
IDP-102 Madras Sewerage R&F improvement (2/28/1995) | ||||||||||
IDP-103 Lake Bhopal Conservation & Management (2/28/1995) | ||||||||||
IDP-104 Rajasthan Forestry Development (2/28/1995) | ||||||||||
IDP-105 Industrial pollution control (WB) (2/28/1995) | ||||||||||
IDP-108 Anpara Power Transmission System II (1/25/1996) | ||||||||||
IDP-109 Bangalore Water Supply & Sewerage Project (1/25/1996) | ||||||||||
IDP-111 Attappady Wasteland Comprehensive Environment (1/25/1996) | ||||||||||
IDP-112 Gujarat Afforest. & Development Project (1/25/1996) | ||||||||||
IDP-113 Kurnool-Cuddapah Canal Modernisation Project (1/25/1996) | ||||||||||
IDP-115 Pipavav Port Ship Breaking Project (1/25/1996) | ||||||||||
IDP-117 West Bengal Transmission System project (2/25/1997) | ||||||||||
IDP-118 Umiam Hydro Power StnRen.Pro. (2/25/1997) | ||||||||||
IDP-121 Delhi Mass Rapid Transport System (2/25/1997) | ||||||||||
IDP-122 Calcutta Transport Infrastruct Development Project (2/25/1997) | ||||||||||
IDP-123 Kerala Water Supply Project (2/25/1997) | ||||||||||
IDP-124 Eastern Karnataka Afforestation Project (2/25/1997) | ||||||||||
IDP-125 Tamil Nadu Afforestation Program (2/25/1997) | ||||||||||
IDP-126 Rajghat Canal Irrigation Program (2/25/1997) | ||||||||||
IDP-128 Srisailem Left Bk. Power Project (2/25/1997) | ||||||||||
JPGL024 Exim Esal to India for US$ 250 M Dt. 22.9.93 (9/22/1993) | ||||||||||
Plan Year Total | ||||||||||
1997-2002 Ninth Five Year Plan | ||||||||||
IDP-127 Simhadri and Vizag Trans.System (12/12/1997) | ||||||||||
IDP-130 Bakreshwer Thermal Power Station Project II (12/12/1997) | ||||||||||
IDP-132 Punjab Afforestation Project (12/12/1997) | ||||||||||
IDP-133 Chhattisgarh Sericulture Proj. (12/12/1997) | ||||||||||
IDP-134 Manipur Sericulture Poject (12/12/1997) | ||||||||||
IDP-135 Rengali Irrigation Project (12/12/1997) | ||||||||||
IDP-137 Bakreshwer Thermal Power Station Project III (3/24/1999) | ||||||||||
IDP-139 Delhi Mass Rapid Transport System Project II (3/30/2001) | ||||||||||
IDP-141 Delhi Mass Rapid Transport System Project (III) (2/13/2002) | ||||||||||
Plan Year Total | ||||||||||
2002-2007 Tenth Five Year Plan | ||||||||||
IDP-142 Simhadri & Vizag Transmission System Project II (5/10/2002) | ||||||||||
IDP-143 West Bengal Transmission System Project (II) (5/10/2002) | ||||||||||
IDP-145 Delhi Mass Rapid Transport System Project (IV) (3/31/2003) | ||||||||||
IDP-146 Punjab Afforestation Project (II) (3/31/2003) | ||||||||||
IDP-147 Bakreswar Thermal Power Station Units Ext. Project (3/31/2003) | ||||||||||
IDP-148 Rajasthan Forestry and Biodiversity Project (3/31/2003) | ||||||||||
IDP-149 Yamuna Action Plan Project (II) (3/31/2003) | ||||||||||
IDP-150 Ajanta-Ellora Conser. & Tourism Dev. Pr. (II) (3/31/2003) | ||||||||||
IDP-150A Ajanta Ellora Conservation & Tourism Development Project-II (3/31/2003) | ||||||||||
IDP-151 Delhi Mass Rapid Transport System Project (V) (3/31/2004) | ||||||||||
IDP-152 Purulia Pumped Storage Project (II) (3/31/2004) | ||||||||||
IDP-154 Rengali Irrigation Project (II) (3/31/2004) | ||||||||||
IDP-155 Kurnool-Cuddapah Canal Modernization Project-II (3/31/2004) | ||||||||||
IDP-156 Umiam Stage-II Hydro Pj.Stn.Renovation & Modernizn (3/31/2004) | ||||||||||
IDP-157 Public Health Engineering Department Rajasthan (3/31/2004) | ||||||||||
IDP-158 Int.Natural Resource Mgmt. & Povty.Pj. in Haryana (3/31/2004) | ||||||||||
IDP-159 Delhi Mass Rapid Transport System Project(VI) (3/31/2005) | ||||||||||
IDP-161 Rajasthan Minor Irrigation Improvement Project (3/31/2005) | ||||||||||
IDP-162 Tamil Nadu Afforestation Project (II) (3/31/2005) | ||||||||||
IDP-163 Karnataka Sus. Forest Manag.&Bio. Conservaton Pro (3/31/2005) | ||||||||||
IDP-164 Ganga Action Plan Project (Varanasi) (3/31/2005) | ||||||||||
IDP-165 Bangalore Water Supply&Sewerage Project Phase II-I (3/31/2005) | ||||||||||
IDP-166 Uttar Pradesh Buddhist Circuit Developement Projec (3/15/2005) | ||||||||||
IDP-167 PURIA PUMPED STORAGE PROJECT(III) (3/31/2006) | ||||||||||
IDP-168 BANGALORE WATER SUPPLY AND SEWERAGE PROJECT (II-2) (3/31/2006) | ||||||||||
IDP-170 Delhi Mass Rapid Transport System Project-Phase 2 (3/31/2006) | ||||||||||
IDP-171 BANGALORE METRO RAIL PROJECT (3/31/2006) | ||||||||||
IDP-172 Swan River Integrated Watershed Management Project (3/31/2006) | ||||||||||
IDP-173 Orissa Forestry Sector Development Project (3/31/2006) | ||||||||||
IDP-174 Hussain Sagar Lake and Catchment Area Improv. Proj (3/31/2006) | ||||||||||
IDP-175 Kolkata Solid Waste Management Improvement Project (3/31/2006) | ||||||||||
IDP-176 Vishakhapatnam Port Expansion Project (3/31/2006) | ||||||||||
IDP-177 Bangalore Distribution Upgradation Project (3/30/2007) | ||||||||||
IDP-178 Transmission System Modernization & Strengthening Project in Hyderabad (3/30/2007) | ||||||||||
IDP-179 DELHI MASS RAPID TRANSPORT SYSTEM PROJECT PHASE 2(II) (3/30/2007) | ||||||||||
IDP-180 VISHAKAPATANAM PORT EXPANSION PROJECT (3/30/2007) | ||||||||||
IDP-181 Andhra Pradesh Irrigation & Livelihood Improvement Project (3/30/2007) | ||||||||||
IDP-182 Tripura Forest Environmental Improvement & Poverty Alleviation Project (3/30/2007) | ||||||||||
IDP-183 Gujarat Forestry Development Project Phase 2 (3/30/2007) | ||||||||||
IDP-184 Kerala Water Supply Project ( II ) (3/30/2007) | ||||||||||
IDP-185 Agra Water Supply Project (3/30/2007) | ||||||||||
IDP-186 Amritsar Sewerage Project (3/30/2007) | ||||||||||
IDP-187 Orissa Integrated Sanitation Improvement Project (3/30/2007) | ||||||||||
Plan Year Total | ||||||||||
2007-2012 Eleventh Five Year Plan | ||||||||||
IDP-188 Maharashtra Transmission System Project (9/14/2007) | ||||||||||
IDP-188A Maharashtra Transmission System Project (9/14/2007) | ||||||||||
IDP-189 Goa Water Supply and Sewerage Project (9/14/2007) | ||||||||||
IDP-189A Goa Water Supply & Sewerage Project (9/14/2007) | ||||||||||
IDP-189B Goa Water Supply and Sewerage Project (9/14/2007) | ||||||||||
IDP-191 Delhi Mass Rapid Transport System Project Phase 2(III) (3/10/2008) | ||||||||||
IDP-191A Delhi Mass Rapid Transport. System Project Phase2(III) (3/10/2008) | ||||||||||
IDP-192 Kolkata East-West Metro Project (3/10/2008) | ||||||||||
IDP-192A Kolkata East-West Metro Project (3/10/2008) | ||||||||||
IDP-193 Hyderabad Outer Ring Road Project Phase-! (3/10/2008) | ||||||||||
IDP-193A HYDERABAD OUTER RING ROAD PROJECT PHASE-I (3/10/2008) | ||||||||||
IDP-194 Forest Department-Uttar Pradesh (3/10/2008) | ||||||||||
IDP-194A U. PRADESH PARTICIPATORY FOREST MANAGEMENT AND POVERTY ALLEVATION PROJECT (3/10/2008) | ||||||||||
IDP-195 TanilNadu Water Supply and Drainage Board (3/10/2008) | ||||||||||
IDP-195A HOGENAKKAL WATER SUPPLY AND FLUROSIS MITGATION PROJECT (3/10/2008) | ||||||||||
IDP-196 Tamilnadu Urban Development Fund (3/10/2008) | ||||||||||
IDP-196A Tamil Nadu Urban Infrastructure Project (3/10/2008) | ||||||||||
IDP-197 CHENNAI METRO PROJECT (11/21/2008) | ||||||||||
IDP-197A CHENNAI METRO PROJECT (11/21/2008) | ||||||||||
IDP-198 Hyderabad Outer Ring Road Project (Phase-II) (11/21/2008) | ||||||||||
IDP-198A Hyderabad Outer Ring Road Project (Phase-II) (11/21/2008) | ||||||||||
IDP-199 Capacity Development for Forest Mgt. & Personnel Trg. Project (11/21/2008) | ||||||||||
IDP-201 Guwahati Water Supply Project (3/31/2009) | ||||||||||
IDP-201A Guwahati Water Supply Project (3/31/2009) | ||||||||||
IDP-202 Delhi MassRapid Transport System Project Phase2(IV) (3/31/2009) | ||||||||||
IDP-202A Delji Mass Rapid Transport System Project Phase2(IV) (3/31/2009) | ||||||||||
IDP-203 Kerala Water Supply Project (III) (3/31/2009) | ||||||||||
IDP-203A Kerala Water Supply Project(III) (3/31/2009) | ||||||||||
IDP-204 Hogenakkal Water Supply & Fluorosis Mitigation Project (Phase 2 ) (3/31/2009) | ||||||||||
IDP-204A Hogenakkal Water Supply & Fluorosis Mitigation Project (Phase 2 ) (3/31/2009) | ||||||||||
IDP-205 Dedicated Freight Corridor Project (Phase I) (10/27/2009) | ||||||||||
IDP-206 Delhi Mass Rapid Transport System Project Phase 2(V) (3/31/2010) | ||||||||||
IDP-206A Delhi Mass Rapid Transport System Project Phase 2 (V) (3/31/2010) | ||||||||||
IDP-207 Kolkata East-West Metro Project (II) (3/31/2010) | ||||||||||
IDP-207A Kolkata East-West Metro Project (II) (3/31/2010) | ||||||||||
IDP-208 Chennai Metrol Project (II) (3/31/2010) | ||||||||||
IDP-208A Chennai Metro Project (II) (3/31/2010) | ||||||||||
IDP-209 Dedicated Freight Corridor Project (Phase I)(II) (3/31/2010) | ||||||||||
IDP-209A Dedicated Freight Corridor Project (Phase I) (II) (3/31/2010) | ||||||||||
IDP-210 Rengali Irrigation Project (3/31/2010) | ||||||||||
IDP-210A Rengali Irrigation Project (III) (3/31/2010) | ||||||||||
IDP-211 Sikkim Biodiversity Conservation & Forest Management Project (3/31/2010) | ||||||||||
IDP-211A Sikkim Biodiversity Conservation & Forest Management Project (3/31/2010) | ||||||||||
Plan Year Total | ||||||||||
Grand Total |